Lift Capacities aerial EEC-0176
V1.0
Platform Removal/Installation-
EZR
C.
Pull and turn both platform locking pins to lock them in the
OPEN
position.
D.
Tilt the leveling bracket downwards (using platform leveling “
OUT
”) until the
rotation bracket clears the top plate of the platform receiver, then retract the
boom several inches to pull the rotation bracket away from the platform.
E.
Finally, disconnect and cap the cable for the upper control box.
Содержание Traffic Safety Service L60
Страница 2: ...Updated March 10 2020...
Страница 5: ......
Страница 37: ...Platform Safety hireach EEC 0145 V1 1 Platform Safety...
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......
Страница 131: ......
Страница 132: ......
Страница 133: ......
Страница 134: ......
Страница 140: ...Bolt Torque EEC 0016 V1 2 Bolt Torque...
Страница 152: ...Platform Level System EEC 0137 V1 0 Platform Leveling System...
Страница 182: ...4 HYDRAULIC SCHEMATIC...
Страница 194: ...16 EXPLODED ISOMETRIC ASSEMBLY DRAWING...
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 212: ...Appendix B Parts Index ELLIOTT Built for You L60 Operator s Manual B 1...