MP200 Installation Manual
30
• The following is a list & order of the fundamental phases that must be followed when starting up a new system.
NOTE
: points 1 to 7 must be carried out with the control unit powered down.
1.
Jumper control and setting for the anti-removal micro on the control unit board: see Paragraph 4.3.
2.
Setting of control unit board dipswitches (zone mode, national parameters): see Paragraph 4.6
3.
Connect control unit board to optional modules (STM 200 Modem Communicator; SV 108 Voice Synthesis;
KV 100 Synthesis Kit).
4.
Calculate the total load on the serial line according to the peripherals used, and if necessary split it equally
over two or three
(MP200-256)
BUS. In this case, connect the control unit board to the IT 485 serial interfaces.
Bear in mind that consumption on one serial line cannot exceed a value of 800mA.
NOTE
: any addition of a serial to a previously programmed control unit means that the programming will be
lost as the acquisition of a new serial requires that the control unit be restored to default parameters.
5.
Address all peripherals (keypads, concentrators, connectors, splitters etc.)
6.
Connect all peripherals on each serial as "loops". See figure below. Each serial line must be terminated
with a resistance of 100/120 ohm 1/2 watt connected between the LA and LB leads of the furthest peripherals.
7.
Connect all sensors and actuators (sirens, controllers etc.)
8.
Connect the power supply unit to the cotnrol unit and then to the mains power supply (para. 5.1.1 / 5.2.1).
The control unit and the peripheral units will then be powered up. Check that they are working correctly, first
with an eyecheck (LEDs light up, display on keypads etc.). In case of short circuits on any part of the
system, the power supply limitation circuit will intervene to avoid damage. For this reason, in this phase the
control unit battery should not connected.
9.
After checking that the system is working properly, connect the control unit battery to the respective poles.
10. Set default parameter values:
see Paragraph 1.4 in the Functioning and Programming manual.
11. Perform system configuration procedure for all devices:
see Paragraph 6.0 in the Functioning and Programming manual.
12. Program the system according to user requirements:
see Paragraph 7.0 in the Functioning and Programming manual.
13. Carry out a full system test.
12.0 Installation Phases