1.  Familiarize 

yourself with the mounting frame which should already be in place in the wall.  If not, refer to the mounting frame installation 

instructions on page 2 before proceeding.

2.  Determine 

location of rough plumbing.  At this point, you should decide which style trap you plan to use.  For easier installation, we 

recommend the use of a swivel trap.

3.  Install

 the basin (See Figure 10).  Hold the basin flush against the wall, positioning the top edge just above the upper edge of the wall 

frame.  Then slide the basin down slowly until it engages the hanger bracket.  Be sure the basin is firmly engaged before releasing it. 

4.  Finish

 securing the basin in place.  Align the  brackets (item 15) at the bottom of the basin with the bracket on the frame.  Fasten the 

brackets together using screws and speed nuts (provided, items 8, 28).

5.  Install 

tailpiece assembly.  Slide the slip nut and gasket from the trap onto the tailpiece.  Insert the tailpiece assembly into the trap and 

align its other end with the drain hole in the basin.  Place rubber gasket between the tailpiece assembly and the basin, then screw in the 

drain plug from above.  Tighten the drain plug.  Tighten slip nut and swivel joint.  Snap the strainer plate into the drain plug.

6.  Install 

a service stop (not provided) on the supply water inlet line.  Turn on supply water and flush thoroughly.

7.  Install 

remote chiller.  Verify that filter has been installed inside chiller.  Slide chiller onto shelf and center it within the shelf guides.  

NOTE:  

Building construction must allow for adequate air flow on both sides, top, and back of chiller.  See chiller instructions for additional 

information.  

8.  Make 

connection between chiller inlet and building supply line (3/8” O.D. copper tube).  

DO NOT SOLDER TUBES 

INSERTED INTO THE UNIONS AS DAMAGE TO THE O-RINGS MAY RESULT.  

(See Figure ).

9.  Make 

connections between remote chiller and fountain.  Outlet port is marked on the chiller (3/8” O.D. copper tube).  

Install a 3/8” x 1/4” x 1/4” T-joint (provided, item 3) on the marked chiller outlet port.  Insert 1/4” Poly in the T-joint and run 

line to regulator.

10. 

Insert 1/4” elbow stem (item 31) into other end of T-joint (item 3).   Insert 1/4” elbow stem (item 31) into cup filler (see 

figure 13.  Run 1/4” poly tubing (provided, 30”) between the two elbow stems.  Turn on water supply, check for leaks, and 

purge air from lines.  

DO NOT SOLDER TUBES INSERTED INTO THE UNIONS AS DAMAGE TO THE O-RINGS MAY 

RESULT.  

(See Figure 11).

11.  These 

products are designed to operate on 20-105 PSIG (0.14-0.72 MPa) supply line pressure.  If inlet pressure is 

above 105 PSIG (0.72 MPa), a pressure regulator must be installed in the supply line.  Any damage caused by reason of 

connecting these products to supply line pressures lower than 20 PSIG (0.14 MPa) or higher than 105 PSIG (0.72 MPa) 

is not covered by warranty.  

12.  Make

 electrical connections to the chiller.  See chiller instructions.    

13.  Check

 stream height from bubbler.  Stream height is factory set at 35 PSI.  If supply pressure varies greatly from 

this, remove items 14 & 16 and adjust screw on regulator (item 27) (See Figure 16).  Clockwise adjustment will raise 

stream height and counter-clockwise adjustment will lower stream height.  For best adjustment, stream should hit basin 

approximately 6-1/2” from bubbler.

14.  Install 

pushbutton to grill.  See Figure 16.  Hold grill and engage angle on top edge of grill with lower edge of basin.  Swing 

bottom of grill into place against the wall and secure grill with mounting screws (provided).

FOUNTAIN INSTALLATION INSTRUCTIONS

BASIN INSTALLATION

FIG. 10

Содержание LJNED10 2AQ Series

Страница 1: ...LD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM To assure you install this model easily and correctly PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING...

Страница 2: ...and top of chiller unit 4 102mm minimum required 3 Install rough plumbing to fountain See Figure 4 for location of supply water inlet to chiller and location of waste water outlet 4 Install wall frame...

Страница 3: ...OFF VALVE BY OTHERS C 1 1 4 32mm DRAIN TUBE PROVIDED D ELECTRICAL INLET 26 1 2 673mm 11 279mm FINISHED FLOOR 55 1 4 1403mm 24 610mm 16 406mm 18 457mm 8 1 4 210mm 13 1 8 333mm WALL OPENING 26 3 8 670m...

Страница 4: ...5 long 1 4 O D poly tubing item 24 provided into fitting on right side of filter head See Figure 7 See Figure 1 for operation of quick connect fittings 5 Install 1 4 x 1 4 John Guest elbow provided to...

Страница 5: ...Make connection between chiller inlet and building supply line 3 8 O D copper tube DO NOT SOLDER TUBES INSERTED INTO THE UNIONS AS DAMAGE TO THE O RINGS MAY RESULT See Figure 9 Make connections betwe...

Страница 6: ...PAGE 6 LJNED10_2AQ 1000002311 Rev D 05 16 TUBE ROUTING DIAGRAM TO BUBBLER REGULATOR ASSEMBLY SEE FIGURE 16 TO CUP FILLER CHILLER INLET CHILLER OUTLET 3 24 24 31 FIG 11...

Страница 7: ...enser approximately 150 lbs or 68 kg 3 Orientate yourself to the configuration of the cup dispenser and remove waste bin Note location of mounting slots in the wall box portion of the cup dispenser se...

Страница 8: ...replacement is necessary see parts list for correct regulator part number Actuation of Quick Connect Water Fittings Cooler is provided with lead free connectors which utilize an o ring water seal To r...

Страница 9: ...8 24 CP 17 40169C NUT HEX 1 5 16 20UN CP 18 40562C GLASS FILLER 19 97466C BUBBLER ASSEMBLY VR 20 45929C TUBE DRAIN 21 50986C HOLDR REGULATOR 22 51294C ASSY FILTER HEAD 23 51299C ASSY FILTER LK LEAD 24...

Отзывы: