1.  Cut

 a rectangular wall opening 25-1/8” (638mm) W x 53-1/2” (1359mm) H, 11-3/8” (289mm) above the floor 

line.  Inside of this opening add (1) 1-1/2” (38mm) stud to create two openings:  (1) 17-3/8” (441mm) W x 53-

1/2” (1359mm) H, and (1) 6-1/4” (159mm) W x 53-1/2” (1359mm) H.  See Figure 3.  Check local codes for 

height requirement.

2.  After

 opening is completed, reinforce opening on all sides so that it may adequately support water cooler 

which weighs up to 150 lbs (68 kg) and also provides a means of securing Mounting Frame in place.

  NOTE:  

Building  construction  must  allow  for  adequate  airflow  on  both  sides  and  top  of  chiller  unit.    4”  (102mm) 

minimum required.

3.  Install

 rough plumbing to fountain.  See Figure 4 for location of supply water inlet to chiller and location of 

waste water outlet.

4.  Install 

wall frame assembly in wall opening with front edge of frame flush with finished wall face.  Secure 

frame through holes in  top and sides to wall support members with 5/16” diameter fasteners (bolts or lag 

screws) as required by wall constructions.  (14) Bolts/screws required, not provided.  

CAUTION:  DO NOT 

USE LESS THAN REQUIRED QUANTITY AND SIZE (DIAMETER) OF FASTENERS.

5.  Install 

electrical conduit.  Figure 4 shows electrical conduit connection location.

6.  Now 

you are ready to install fountain.

MOUNTING FRAME INSTALLATION INSTRUCTIONS

53-1/2"

1359mm

11-3/8"

289mm

17-3/8"

441mm

6-1/4"

159mm

25-1/8"

638mm

SCREW FRAME INTO WALL OPENING

(14)  PLCS

10

Содержание LJNED10 2AQ Series

Страница 1: ...LD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM To assure you install this model easily and correctly PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING...

Страница 2: ...and top of chiller unit 4 102mm minimum required 3 Install rough plumbing to fountain See Figure 4 for location of supply water inlet to chiller and location of waste water outlet 4 Install wall frame...

Страница 3: ...OFF VALVE BY OTHERS C 1 1 4 32mm DRAIN TUBE PROVIDED D ELECTRICAL INLET 26 1 2 673mm 11 279mm FINISHED FLOOR 55 1 4 1403mm 24 610mm 16 406mm 18 457mm 8 1 4 210mm 13 1 8 333mm WALL OPENING 26 3 8 670m...

Страница 4: ...5 long 1 4 O D poly tubing item 24 provided into fitting on right side of filter head See Figure 7 See Figure 1 for operation of quick connect fittings 5 Install 1 4 x 1 4 John Guest elbow provided to...

Страница 5: ...Make connection between chiller inlet and building supply line 3 8 O D copper tube DO NOT SOLDER TUBES INSERTED INTO THE UNIONS AS DAMAGE TO THE O RINGS MAY RESULT See Figure 9 Make connections betwe...

Страница 6: ...PAGE 6 LJNED10_2AQ 1000002311 Rev D 05 16 TUBE ROUTING DIAGRAM TO BUBBLER REGULATOR ASSEMBLY SEE FIGURE 16 TO CUP FILLER CHILLER INLET CHILLER OUTLET 3 24 24 31 FIG 11...

Страница 7: ...enser approximately 150 lbs or 68 kg 3 Orientate yourself to the configuration of the cup dispenser and remove waste bin Note location of mounting slots in the wall box portion of the cup dispenser se...

Страница 8: ...replacement is necessary see parts list for correct regulator part number Actuation of Quick Connect Water Fittings Cooler is provided with lead free connectors which utilize an o ring water seal To r...

Страница 9: ...8 24 CP 17 40169C NUT HEX 1 5 16 20UN CP 18 40562C GLASS FILLER 19 97466C BUBBLER ASSEMBLY VR 20 45929C TUBE DRAIN 21 50986C HOLDR REGULATOR 22 51294C ASSY FILTER HEAD 23 51299C ASSY FILTER LK LEAD 24...

Отзывы: