PAGE 2
LJNED10_2AQ
1000002311 (Rev. D - 05/16)
FIG. 3
1. Cut
a rectangular wall opening 25-1/8” (638mm) W x 53-1/2” (1359mm) H, 11-3/8” (289mm) above the floor
line. Inside of this opening add (1) 1-1/2” (38mm) stud to create two openings: (1) 17-3/8” (441mm) W x 53-
1/2” (1359mm) H, and (1) 6-1/4” (159mm) W x 53-1/2” (1359mm) H. See Figure 3. Check local codes for
height requirement.
2. After
opening is completed, reinforce opening on all sides so that it may adequately support water cooler
which weighs up to 150 lbs (68 kg) and also provides a means of securing Mounting Frame in place.
NOTE:
Building construction must allow for adequate airflow on both sides and top of chiller unit. 4” (102mm)
minimum required.
3. Install
rough plumbing to fountain. See Figure 4 for location of supply water inlet to chiller and location of
waste water outlet.
4. Install
wall frame assembly in wall opening with front edge of frame flush with finished wall face. Secure
frame through holes in top and sides to wall support members with 5/16” diameter fasteners (bolts or lag
screws) as required by wall constructions. (14) Bolts/screws required, not provided.
CAUTION: DO NOT
USE LESS THAN REQUIRED QUANTITY AND SIZE (DIAMETER) OF FASTENERS.
5. Install
electrical conduit. Figure 4 shows electrical conduit connection location.
6. Now
you are ready to install fountain.
MOUNTING FRAME INSTALLATION INSTRUCTIONS
53-1/2"
1359mm
11-3/8"
289mm
17-3/8"
441mm
6-1/4"
159mm
25-1/8"
638mm
SCREW FRAME INTO WALL OPENING
(14) PLCS
10