Before fitting the unhanded door post, offer the glass panels to the door (see glazing plan in 
booklet for glass size guide on door), slide them in from the side. Carefully attach the unhand-
ed door post in the same way as before, ensuring the glass is sitting in the correct position 
(sitting on the beading channels of the door posts) before tightening the screws. 

 

6. 

Make sure all angles are square 

 

and tighten all screws. Now insert 

 

2 glazing clips to the glass on the 

 

unhanded door post.  
The other side of the door is 
clipped using a pvc glass strip (or 
clip cap). Cut the strip to the correct length and push into the cavity between the glass and the 
handed door post. The cap when fitted acts as a wedge to prevent movement of the glass. Met-
al clips are not fitted to this bar. 

 
7. 

Fix each door wheel into position by pushing the bolt provided through the centre of the 

 

wheel and then through the hole in the top door panel from underneath (i.e. from the inside of 

 

the door). Put the washer over the bolt and secure with the nut provided, tightening until there 

 

is no movement on the bolt. The nuts are lock-nuts and are harder to put on than normal nuts 

 

in general assembly. The wheel will revolve freely because it has ball bearings in it. 

The 

 

wheel has a collar protruding from the centre, this collar goes against the inside face of 

 

the top door panel. (See picture below).

 

 

8. 

Slip the nylon door skids on each of the bottom panels. This may already have been done pri

 

or to delivery. After fitting the doors (see later in the booklet), you may need to lower the 

 

door skid so that it engages with the bottom door cill to allow smooth movement of the door. 

 

Lower the skid on each door and insert a self tapping screw at each end of the skid to rein

 

force the position. 

 

9. 

Build the right hand door using the remaining handed and unhanded door post. Viewed from 

 

the outside, the handed door post will be on the left of the door, while the unhanded door post 

 

will be on the right. At this point you must decide the height you would like your door lock. 

 

The hole to take the door lock is on the left hand side of the infill panel. You can decide to fit 

 

this panel to the 2nd or 3rd panel down. 

Make sure you fit the glass before final fixing of 

 

the door. 

See glazing plan towards the back of this booklet 

 
10.  Thread the stainless steel backed brush 
 

extruder into the PVC carrier. This may 

 

already have been done prior to delivery 

 
11.  Turn the doors over and insert the black 

brush draught excluder in the groove (bolt 
slot) in the unhanded door posts. Insert a 
nut and bolt at the bottom of each un-
handed door post and tighten so that the 
brush will not slip down when the door is 
in its upright position,  Cut off the surplus 
brush and carrier at the top of the bar 

 

12.  Do not fit the door to the gable at this 

stage – wait until the structure is fully 
assembled prior to glazing. 

13.  Door handles can now be fitted. 

Содержание 4'3" wide compact

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ... 1 1 1 20 Top door panel With name plate taped together and marked door 2 2 2 2 21 Bottom door panel 2 2 2 2 22 Middle door panel 6 6 6 6 23 Door track support 1 1 1 1 24 Door posts 2 unhanded 2 handed 4 4 4 4 25 Side glazing bar 2 4 6 8 26 Roof glazing bar 2 4 6 8 27 Vent in packs 1 1 1 2 28 Door end glazing bars Taped together and marked door end 2 2 2 2 29 Door end horizontal angle 2 2 2 2 30 D...

Страница 5: ...erable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gloves should be worn If your greenhouse is a painted one there are a few 1 8 3mm holes in the end of the bars These are jig holes for painting and have no bearing on construction Key Point WHEN CONSTRUCTING A POWDER...

Страница 6: ...t 5 Doors 6 Bag of fittings containing Nuts and bolts general assembly Overlap clips for glass Spring clips for glass Casement stay Casement stay nuts and bolts Four eave plates not in the main bag but taped up with the casement stay Two ridge plates Four door wheels Two door guides Small self tapping screws Double door lock Rectangular plates 3 elongated holes 7 Roof bars 8 Coil of glazing beadin...

Страница 7: ...f the glazing bar Fix the built in base to the middle glazing bar by pushing the bolt through the hole in the built in base and tightening as before 4 long model will only have 1 side glazing bar per side assembly 2 for the 6 etc Correctly position the built in base on the outermost glazing bars by pushing the bolts through the holes in the built in base but do not put the nuts on yet 6 8 and 10 m...

Страница 8: ...BEWARE OF SHARP EDGES ...

Страница 9: ...n the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the corner bar You must ensure that the middle hole is nearer to the eaves plate than the ridge plate Key Point ...

Страница 10: ... 3 from the end of the bar These will later be used in the general assembly for fixing the ridge eave and built in base to the ends Now secure the ridge plate and eaves plates by inserting bolts through the plates and into the holes punched in the flange of the corner bar at the apex and eave Do not tighten the nuts and bolts in the plates at this stage finger tip tighten is sufficient N B If you ...

Страница 11: ...ng bars Components 2 door end built in base 2 end glazing bars side corner bars unmarked top door track door end horizontal angle door end bracing angles main door track support 2 roof corner bars marked R INSTRUCTIONS 1 Assemble the frame in exactly the same way as the rear end up to and including stage 3 of the rear end The differ ence with the door end is that instead of 1 long built in base pi...

Страница 12: ... main door track support and the small angle door track support by inserting 3 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening At this stage you do not need to adjust the track for level or square This will be done later when fitting the doors 8 Insert 2 extra bolts into each end of the door track which will be use...

Страница 13: ...DOOR END ASSEMBLY ...

Страница 14: ... post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of each bar i e only one length of glazing bead ing per bar 2 Place the top bottom and 3 infill panels in position as shown by the po sition of the screw holes in the side pieces and the panels The top panel has the greenhouse ...

Страница 15: ...panel See picture below 8 Slip the nylon door skids on each of the bottom panels This may already have been done pri or to delivery After fitting the doors see later in the booklet you may need to lower the door skid so that it engages with the bottom door cill to allow smooth movement of the door Lower the skid on each door and insert a self tapping screw at each end of the skid to rein force the...

Страница 16: ......

Страница 17: ...up or down in the channel so that the notch on the cam locates comfortably when horizontal Tight en all components FINISHING OFF To prevent the door from sliding past its opening you must fix 2 angle brackets to the door end as sembly Insert a cropped head bolt into the bolt channel at the top of the left hand glazing bar viewed from the inside and fix and angle bracket as shown in the picture bel...

Страница 18: ...ail up permost The vent top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slot in the vent side and top rails and trim to suit 4 Insert a bolt into each end of the vent side rail bolt slots put these bolts through the holes in the vent top and bottom rails add nuts and lightly tighten Check that all join...

Страница 19: ...ASSEMBLY OF GREENHOUSE UNIT ...

Страница 20: ... this can now be attached to the end built in base utilising the bolts inserted at frame assembly 6 Do the same at the other three corners 7 Slide the glazing beading into both sides of the ridge before attaching the ridge to the roof corner bars Insert the end of the ridge through the small gap in the roof corner bars at the top the vertical part of the ridge will be outside pointing skywards and...

Страница 21: ...e roof vent hinge insert a small self tapping screw into the black tube approxi mately way along then tighten the screw The tube will expand and lock into position thus preventing sideways movement of the roof vent These are two tubes one each side of the vent N B There is no hole for the screw but it will easily push into the black tube and screw up Key Point The roof vent overlaps the two glazin...

Страница 22: ...s HARD STANDING Having established the square of the greenhouse drill the patio or concrete in the re quired positions fit plastic plugs and screw the angle brackets attached during subas sembly firmly to the ground using 35mm x 8mm round head screws and stainless steel washers SOIL FLOOR Determine the square of the greenhouse as described above make a mix of concrete and put a couple of shovelful...

Страница 23: ...use is the door end ramp cill The ramp is at tached to the door end cill by engaging the nub of the door end cill to the C groove of the ramp The ramp is now rotated to horizontal Drill a hole at each end approx 20mm in from the end of the ramp and into the floor Plug and screw If you are fitting onto soft ground you must ensure that a solid material is underneath the ramp to avoid damage when you...

Страница 24: ...p clip upwards to support the glass Secure the pane by inserting another two clips inch from the top of the pane Then put 1 overlap clip in the middle Put the top pane of glass under the gutter and then rest it on the 2 clips at the top of the middle pane Now put 2 clips approx 6 up from the bottom of the final piece of glass and 2 clips 4 from the top 5 Repeat this all along this side of the hous...

Страница 25: ...in the louvre box replaces 1 A pane You must ensure that you fit glass above and below the louvre The louvre can not sit directly on the bottom aluminium cill Key Point Ref Size A B D E F G X3 C2 C3 4 X 4 14 1 4 8 4 6 4 1 1 6 X 4 20 1 6 8 6 6 4 1 1 8 X 4 26 1 8 8 8 6 4 1 1 Ref Width mm Length mm A 610 610 B 610 457 D 610 210 E 610 305 F 610 267 G 300 457 ...

Страница 26: ...tin on top of the lower pane making sure you have differ entiated between the inside and outside of the P V C see diagram below The next pane sits on top of the overlap and is clipped in as normal Muntins will be found in the packets of cut size glass where appropriate The quantities will change slightly if you have ordered extra vents and louvres If you intend to fit a louvre to the greenhouse yo...

Страница 27: ...OUSE IS NOW COMPLETE Code Width mm Length mm 9 610 1197 11 305 1197 18 610 610 19 610 457 23 610 1456 24 610 803 25 610 210 52 298 457 Ref Size 9 11 18 19 23 24 25 52 62 63 75 4 x 4 1 4 1 1 4 3 1 6 1 1 4 6 x 4 1 4 1 1 6 5 1 6 1 1 4 8 x 4 1 4 1 1 8 7 1 6 1 1 4 ...

Страница 28: ...ELITE 1403 ...

Отзывы: