background image

DOOR FRAME ASSEMBLY 

Each Door consists of: 
1 unhanded door post  
1 handed door post (handed post for left door is different profile to the handed right hand door post) 
3 infill panels (1 with pre fabricated lock hole) for lock barrel 
1 top and bottom door panels 
3 panels of glass which must be fitted during door assembly. 

It is not possible to fit glass after the 

door is built

 

 

From the main bag of fittings you require;  
2 door wheels 
1 clip on nylon door skid (this might already be fitted to the bottom door panel) 
2 lengths of black brush draught excluder with PVC carrier 
Door lock, self tapping screws and spring washers 
12’ glazing beading 
Door handles 
3 PVC Glass strips 
 
 
 
 
 
 
 
 

 

Left hand Door (viewed from outside) 
Identify the correct door posts

. The handed door post for the left hand door has a bolt channel, 

whereas the handed door post for the right hand door post does not

. (Key point). 

 

1. 

Place one unhanded post and the handed post for left hand door on a level surface roughly two 
feet apart with the bolt slots facing downwards. (Unhanded door post on 
the left, handed door post on the right). The top of each side post has two 
screw holes in it, the bottom has three. 

(Key point).

 Slide the glazing 

beading into the groove of each bar i.e. only one length of glazing bead-
ing per bar. 

 

2. 

Place the top, bottom and 3 infill panels in position as shown by the po-
sition of the screw holes in the side pieces and the panels. The top panel has the greenhouse 
name on it. The bottom panel has the edge for the door skid to fit on. The lower infill panel 
locks on to the bottom panel. The infill panel for the left hand door 

does not 

have a pre fabri-

cated hole for the lock barrel. 

 
3. 

Fix the left hand door post to the door panels by screwing through the door side pieces into 
the holes provided in the edge of the panels with the self tapping screws. The screws will go 
in more easily and with out danger of trying to go crooked if you can put a small amount of 
grease on the screw before assembling the doors. Alternatively, you could insert the screws 
into the screw eyes of the door panels before assembling the door; this would have the effect 
of pre-self tapping the panels prior to assembly, making assembly easier. 

 

4. 

GLASS MUST BE FITTED TO EACH DOOR BEFORE THE 2ND DOOR POST IS 

 

FITTED—KEY POINT

 

Содержание 4'3" wide compact

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ... 1 1 1 20 Top door panel With name plate taped together and marked door 2 2 2 2 21 Bottom door panel 2 2 2 2 22 Middle door panel 6 6 6 6 23 Door track support 1 1 1 1 24 Door posts 2 unhanded 2 handed 4 4 4 4 25 Side glazing bar 2 4 6 8 26 Roof glazing bar 2 4 6 8 27 Vent in packs 1 1 1 2 28 Door end glazing bars Taped together and marked door end 2 2 2 2 29 Door end horizontal angle 2 2 2 2 30 D...

Страница 5: ...erable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gloves should be worn If your greenhouse is a painted one there are a few 1 8 3mm holes in the end of the bars These are jig holes for painting and have no bearing on construction Key Point WHEN CONSTRUCTING A POWDER...

Страница 6: ...t 5 Doors 6 Bag of fittings containing Nuts and bolts general assembly Overlap clips for glass Spring clips for glass Casement stay Casement stay nuts and bolts Four eave plates not in the main bag but taped up with the casement stay Two ridge plates Four door wheels Two door guides Small self tapping screws Double door lock Rectangular plates 3 elongated holes 7 Roof bars 8 Coil of glazing beadin...

Страница 7: ...f the glazing bar Fix the built in base to the middle glazing bar by pushing the bolt through the hole in the built in base and tightening as before 4 long model will only have 1 side glazing bar per side assembly 2 for the 6 etc Correctly position the built in base on the outermost glazing bars by pushing the bolts through the holes in the built in base but do not put the nuts on yet 6 8 and 10 m...

Страница 8: ...BEWARE OF SHARP EDGES ...

Страница 9: ...n the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the corner bar You must ensure that the middle hole is nearer to the eaves plate than the ridge plate Key Point ...

Страница 10: ... 3 from the end of the bar These will later be used in the general assembly for fixing the ridge eave and built in base to the ends Now secure the ridge plate and eaves plates by inserting bolts through the plates and into the holes punched in the flange of the corner bar at the apex and eave Do not tighten the nuts and bolts in the plates at this stage finger tip tighten is sufficient N B If you ...

Страница 11: ...ng bars Components 2 door end built in base 2 end glazing bars side corner bars unmarked top door track door end horizontal angle door end bracing angles main door track support 2 roof corner bars marked R INSTRUCTIONS 1 Assemble the frame in exactly the same way as the rear end up to and including stage 3 of the rear end The differ ence with the door end is that instead of 1 long built in base pi...

Страница 12: ... main door track support and the small angle door track support by inserting 3 bolts into the bolt slot of the door track Position 3 of these through the 3 holes in the door track support above the door opening At this stage you do not need to adjust the track for level or square This will be done later when fitting the doors 8 Insert 2 extra bolts into each end of the door track which will be use...

Страница 13: ...DOOR END ASSEMBLY ...

Страница 14: ... post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of each bar i e only one length of glazing bead ing per bar 2 Place the top bottom and 3 infill panels in position as shown by the po sition of the screw holes in the side pieces and the panels The top panel has the greenhouse ...

Страница 15: ...panel See picture below 8 Slip the nylon door skids on each of the bottom panels This may already have been done pri or to delivery After fitting the doors see later in the booklet you may need to lower the door skid so that it engages with the bottom door cill to allow smooth movement of the door Lower the skid on each door and insert a self tapping screw at each end of the skid to rein force the...

Страница 16: ......

Страница 17: ...up or down in the channel so that the notch on the cam locates comfortably when horizontal Tight en all components FINISHING OFF To prevent the door from sliding past its opening you must fix 2 angle brackets to the door end as sembly Insert a cropped head bolt into the bolt channel at the top of the left hand glazing bar viewed from the inside and fix and angle bracket as shown in the picture bel...

Страница 18: ...ail up permost The vent top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the slot in the vent side and top rails and trim to suit 4 Insert a bolt into each end of the vent side rail bolt slots put these bolts through the holes in the vent top and bottom rails add nuts and lightly tighten Check that all join...

Страница 19: ...ASSEMBLY OF GREENHOUSE UNIT ...

Страница 20: ... this can now be attached to the end built in base utilising the bolts inserted at frame assembly 6 Do the same at the other three corners 7 Slide the glazing beading into both sides of the ridge before attaching the ridge to the roof corner bars Insert the end of the ridge through the small gap in the roof corner bars at the top the vertical part of the ridge will be outside pointing skywards and...

Страница 21: ...e roof vent hinge insert a small self tapping screw into the black tube approxi mately way along then tighten the screw The tube will expand and lock into position thus preventing sideways movement of the roof vent These are two tubes one each side of the vent N B There is no hole for the screw but it will easily push into the black tube and screw up Key Point The roof vent overlaps the two glazin...

Страница 22: ...s HARD STANDING Having established the square of the greenhouse drill the patio or concrete in the re quired positions fit plastic plugs and screw the angle brackets attached during subas sembly firmly to the ground using 35mm x 8mm round head screws and stainless steel washers SOIL FLOOR Determine the square of the greenhouse as described above make a mix of concrete and put a couple of shovelful...

Страница 23: ...use is the door end ramp cill The ramp is at tached to the door end cill by engaging the nub of the door end cill to the C groove of the ramp The ramp is now rotated to horizontal Drill a hole at each end approx 20mm in from the end of the ramp and into the floor Plug and screw If you are fitting onto soft ground you must ensure that a solid material is underneath the ramp to avoid damage when you...

Страница 24: ...p clip upwards to support the glass Secure the pane by inserting another two clips inch from the top of the pane Then put 1 overlap clip in the middle Put the top pane of glass under the gutter and then rest it on the 2 clips at the top of the middle pane Now put 2 clips approx 6 up from the bottom of the final piece of glass and 2 clips 4 from the top 5 Repeat this all along this side of the hous...

Страница 25: ...in the louvre box replaces 1 A pane You must ensure that you fit glass above and below the louvre The louvre can not sit directly on the bottom aluminium cill Key Point Ref Size A B D E F G X3 C2 C3 4 X 4 14 1 4 8 4 6 4 1 1 6 X 4 20 1 6 8 6 6 4 1 1 8 X 4 26 1 8 8 8 6 4 1 1 Ref Width mm Length mm A 610 610 B 610 457 D 610 210 E 610 305 F 610 267 G 300 457 ...

Страница 26: ...tin on top of the lower pane making sure you have differ entiated between the inside and outside of the P V C see diagram below The next pane sits on top of the overlap and is clipped in as normal Muntins will be found in the packets of cut size glass where appropriate The quantities will change slightly if you have ordered extra vents and louvres If you intend to fit a louvre to the greenhouse yo...

Страница 27: ...OUSE IS NOW COMPLETE Code Width mm Length mm 9 610 1197 11 305 1197 18 610 610 19 610 457 23 610 1456 24 610 803 25 610 210 52 298 457 Ref Size 9 11 18 19 23 24 25 52 62 63 75 4 x 4 1 4 1 1 4 3 1 6 1 1 4 6 x 4 1 4 1 1 6 5 1 6 1 1 4 8 x 4 1 4 1 1 8 7 1 6 1 1 4 ...

Страница 28: ...ELITE 1403 ...

Отзывы: