background image

16 

5.  

Before fitting the unhanded door post, offer the glass panels to the door (see glazing plan in 
booklet for glass size guide on door), slide them in from the side. Carefully attach the unhand-
ed door post in the same way as before, ensuring the glass is sitting in the correct position 
(sitting on the beading channels of the door posts) before tightening the screws. 

 

6. 

Make sure all angles are square and tighten all screws. Now insert 2 glazing clips to the glass 

 

on the unhanded door post.  
The other side of the door is clipped using a pvc glass strip (or clip cap). Cut the strip to the 
correct length and push into the cavity between the glass and the handed door post. The cap 
when fitted acts as a wedge to prevent movement of the glass. Metal clips are not fitted to this 
bar. 

 
7. 

Fix each door wheel into position by pushing the bolt provided through the centre of the 

 

wheel and then through the hole in the top door panel from underneath (i.e. from the inside of 

 

the door). Put the washer over the bolt and secure with the nut provided, tightening until there 

 

is no movement on the bolt. The nuts are lock-nuts and are harder to put on than normal nuts 

 

in general assembly. The wheel will revolve freely because it has ball bearings in it. 

The 

 

wheel has a collar protruding from the centre, this collar goes against the inside face of 

 

the top door panel. (See picture below).

 

 

8. 

Slip the nylon door skids on each of the bottom panels. This may already have been done pri

 

or to delivery. After fitting the doors (see later in the booklet), you may need to lower the 

 

door skid so that it engages with the bottom door cill to allow smooth movement of the door. 

 

Lower the skid on each door and insert a self tapping screw at each end of the skid to rein

 

force the position. 

 
9. 

Build the right hand door using the remaining handed and unhanded door post. Viewed from 

 

the outside, the handed door post will be on the left of the door, while the unhanded door post 

 

will be on the right. At this point you must decide the height you would like your door lock. 

 

The hole to take the door lock is on the left hand side of the infill panel. You can decide to fit 

 

this panel to the 2nd or 3rd panel down. 

Make sure you fit the glass before final fixing of 

 

the door. 

See glazing plan towards the back of this booklet. 

 
10.  Thread the stainless steel backed brush extruder into the PVC carrier. This may already have 
 

been done prior to delivery. 

 
11.  Turn the doors over and insert the black 

brush draught excluder in the groove 
(bolt slot) in the unhanded door posts. 
Insert a nut and bolt at the bottom of 
each unhanded door post and tighten so 
that the brush will not slip down when 
the door is in its upright position. Cut off 
the surplus brush and carrier at the top of 
the bar. 

 

12.  Do not fit the door to the gable at this 

stage – wait until the structure is fully 
assembled prior to glazing. 

 
13.  Door handles can now be fitted. 

Содержание STREAMLINE Series

Страница 1: ......

Страница 2: ...2...

Страница 3: ...3...

Страница 4: ...plates 2 2 2 2 23 Top door track 1 1 1 1 24 Top door panel With name plate taped 2 2 2 2 25 Bottom door panel together and marked 2 2 2 2 26 Middle door panel door 6 6 6 6 27 Door track support 1 1 1...

Страница 5: ...nhouse in vulnerable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gl...

Страница 6: ...fittings containing Nuts and bolts general assembly Overlap clips for glass Spring clips for glass Casement stay Casement stay nuts and bolts Four eave plates not in the main bag but taped up with the...

Страница 7: ...e holes in the eaves bar and securing with a nut You do not need to tighten the nuts too much at this stage but they need to be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the...

Страница 8: ...uired number of bolts into the glazing bars Lay out the component parts on the ground as though you were standing on the inside of a completed green house i e with the bolt slots uppermost Glazing Bar...

Страница 9: ...n the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the cor ner bar You must ensure that the middle hole...

Страница 10: ...er bars have 3 grooves to receive beading Do not use the middle one only the two outer grooves require glazing beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finge...

Страница 11: ...nto the built in base cill This will be used later to attach the bolt down brack ets 11 Slide a bolt into the bolt slot in the built in base section one at each end Attach the corner bracket angle app...

Страница 12: ...he end of the two built in base pieces 3 Slide 2 bolts into the bottom of each glazing bar and 3 bolts only 1 if greenhouse to be sited on soft ground into the free end of each built in base section A...

Страница 13: ...wnwards If you are fitting your greenhouse onto soft ground then do not fit the corner bracket yet If you are on a patio you will need to cut the bracket off level with the bottom of the built in base...

Страница 14: ...14...

Страница 15: ...nhanded door post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of each bar i e...

Страница 16: ...panel See picture below 8 Slip the nylon door skids on each of the bottom panels This may already have been done pri or to delivery After fitting the doors see later in the booklet you may need to lo...

Страница 17: ...17 DOOR FRAME ASSEMBLY...

Страница 18: ...les are fitted to the infill panel on each door choose between 1st or 2nd panel down Posi tion the handle centrally and mark the hole position Drill 7mm diameter holes 2 holes per door then fit the ha...

Страница 19: ...st The vent top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the beading groove in the vent side and vent to...

Страница 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...

Страница 21: ...olt and tighten up Key Point 5 The built in base attaches to the inside of the corner bar The bolt placed in the corner bar bolt slot at gable end assembly will slide down into the slotted hole at the...

Страница 22: ...osition thus preventing sideways movement of the vent N B There is no hole for the screw but it will easily push into the tube and screw up Key Point You only require one tube per vent on the left han...

Страница 23: ...ll glass retaining lip just above the combined eaves bar and gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out of square the corner diagonally...

Страница 24: ...ides of the door opening and at tach the flat bars using the end with the larger hole leave finger tip tight Let the flat bar hang down then slide them left right until the smaller hole at the bottom...

Страница 25: ...vent the door from sliding past its opening you must fix 2 angle brackets to the door end assembly Insert a cropped head bolt into the bolt channel at the top of the left hand glaz ing bar viewed from...

Страница 26: ...nels will require a larger overlap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key Point 4 Offer the next pane of glass to the glazing bars resting it on the two clips of...

Страница 27: ...vre replaces one A The louvre must be sandwiched between the 610 x 140 and the A pane and must go on the rear gable horticultural glass application only Ref Width Length A 610 610 B 610 457 C 610 410...

Страница 28: ...r the position of the different sizes 5 The glass is clipped onto the frame in the same way as the horticultural glass is but use 8 clips per large pane You do not use stainless steel clips if you hav...

Страница 29: ...ref 13 with 610mm x274mm the louvre and 1 ref 18 The louvre must be sandwiched between the two panes of glass It must not sit directly onto the aluminium base cill Ref Width mm Length mm 12 457 1197 1...

Страница 30: ...r to the 1st if this 2nd finial over hangs the ridge by up to 25mm 1 you can move the 1st finial and crestings so there is an equal overhang of 12 5mm 1 2 Insert the small self tapping screw into the...

Страница 31: ...31 OPTIONAL EXTRA RAINWATER KITS...

Страница 32: ...32 ELITE 1803...

Отзывы: