11
7.
You can now attach the rear end horizontal angle to the
top bolt
of the eave plate and to the
other bolts in the glazing bars you inserted in 6, above.
8.
Check that all angles between built in base and the vertical members are at 90 degrees and
that the glazing bars are right into the upper angle of the built in base at the bottom.
(Key
Point).
9.
Tighten all nuts.
10. If you intend to position the greenhouse onto hard standing (flags, concrete etc) then slide
two extra bolts into the built in base cill. This will be used later to attach the bolt down brack-
ets.
11. Slide a bolt into the bolt slot in the built in base section, one at each end. Attach the corner
bracket angle (approx. 400mm long with 6 holes in, 2 at the top and 4 at the bottom) so that it
is pointing downwards. If you are fitting your greenhouse onto soft ground, then do not fit the
corner bracket yet. If you are on a patio, you will need to cut the corner bracket level with
the bottom of the built in base and slide extra bolts into the bolt channel to be attached to the
corner bracket (generally 1 every 2’). If you are on soil, the corner bracket will go into the
ground at general assembly.
Содержание STREAMLINE Series
Страница 1: ......
Страница 2: ...2...
Страница 3: ...3...
Страница 14: ...14...
Страница 17: ...17 DOOR FRAME ASSEMBLY...
Страница 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...
Страница 31: ...31 OPTIONAL EXTRA RAINWATER KITS...
Страница 32: ...32 ELITE 1803...