background image

12 

DOOR END ASSEMBLY 

 

From the main bag of fittings you will require the nuts and bolts, 2 eave plates and 1 ridge plate.  
These are packed with the casement stay and are separate from the main bag of fittings. 

 

Components 
2 door end built in base 
1 end glazing bars 
2 side corner bars (unmarked) 
1 top door track 
2 door end horizontal angle  
2 door end diagonal angle brace 
1 main door track support 
2 roof corner bars (marked “R”) 
2 connecting plates 

 

INSTRUCTIONS

 

1. 

Assemble the frame in exactly the same way as the rear end, up to and including stage 3 of the 
rear end. The difference with the door end is that instead of 1 long built in base piece, the door 
end has 2 smaller pieces (1 either side of the door opening) and 1 door end cill. 

 

2. 

Now engage the door end cill with the 2 built in base pieces by pushing the angle of the cill  

 

under the locator as shown in the diagram.

 

At this stage the cill will move freely left and right  

         but will remain located to the built in base. The cill has 2 holes punched in the upper flanges 
 

approximately 300mm in from either end. When the cill is in the correct position, either end 

 

of it is approximately 150mm in from the end of the two built in base pieces. 

 
3. 

Slide 2 bolts into the bottom of each glazing bar and 3 bolts (only 1 if greenhouse to be sited 
on soft ground) into the free end of each built in base section. Attach the 2

nd

 bolt in the  

 

glazing bar to the hole in the door end cill, but do not put a nut on yet. 

 

Remember, the door end glazing bars are 95 mm longer than the rear end ones and do not sit 
on top of the base (as the rear end glazing bars do), they go down the side of the base and at-
tached to the bottom cill. (Key Point). 

 
4. 

Attach the door end connecting plate (with 3 holes) to the 2 
bolts inserted in the glazing bars and the last bolt inserted into 
the built in base ensuring that the glazing bar is tight down 

          into the angle of the door end cill. Attach the door end      
          diagonal brace to the top bolt of the door end connecting  
          plate. The 2 unoccupied bolts in the built in base sections will 
          be used to anchor the greenhouse to the floor and attach the       

corner base leg. 

 

5. 

Attach the main door track support (shaped like a letter ‘Z’ to 
be found with the door panels) to the two bolts that secure the 
glazing bars to the corner bars. 

(Key Point). 

This ‘Z’ shaped 

bar must be fitted with the two outside slots facing upwards 
(as illustrated) 

not

 downwards. 

 
6. 

The two door end horizontal angles attach to the 

top bolt 

in the eave plate and the vertical 

glazing bars. 

Содержание STREAMLINE Series

Страница 1: ......

Страница 2: ...2...

Страница 3: ...3...

Страница 4: ...plates 2 2 2 2 23 Top door track 1 1 1 1 24 Top door panel With name plate taped 2 2 2 2 25 Bottom door panel together and marked 2 2 2 2 26 Middle door panel door 6 6 6 6 27 Door track support 1 1 1...

Страница 5: ...nhouse in vulnerable locations such as under trees playing areas etc Children should not play near glass greenhouses REMEMBER glass is fragile handle with care Protective eye glasses should be worn Gl...

Страница 6: ...fittings containing Nuts and bolts general assembly Overlap clips for glass Spring clips for glass Casement stay Casement stay nuts and bolts Four eave plates not in the main bag but taped up with the...

Страница 7: ...e holes in the eaves bar and securing with a nut You do not need to tighten the nuts too much at this stage but they need to be tight enough to stop the bolts slipping out of the glazing bar 5 Fix the...

Страница 8: ...uired number of bolts into the glazing bars Lay out the component parts on the ground as though you were standing on the inside of a completed green house i e with the bolt slots uppermost Glazing Bar...

Страница 9: ...n the outside which indicate that they meet at the ridge and are also mitred at both ends If you have a painted greenhouse there is no letter R on the cor ner bar You must ensure that the middle hole...

Страница 10: ...er bars have 3 grooves to receive beading Do not use the middle one only the two outer grooves require glazing beading 3 Slide two bolts into the bolt channel of each corner bar put a nut on and finge...

Страница 11: ...nto the built in base cill This will be used later to attach the bolt down brack ets 11 Slide a bolt into the bolt slot in the built in base section one at each end Attach the corner bracket angle app...

Страница 12: ...he end of the two built in base pieces 3 Slide 2 bolts into the bottom of each glazing bar and 3 bolts only 1 if greenhouse to be sited on soft ground into the free end of each built in base section A...

Страница 13: ...wnwards If you are fitting your greenhouse onto soft ground then do not fit the corner bracket yet If you are on a patio you will need to cut the bracket off level with the bottom of the built in base...

Страница 14: ...14...

Страница 15: ...nhanded door post on the left handed door post on the right The top of each side post has two screw holes in it the bottom has three Key point Slide the glazing beading into the groove of each bar i e...

Страница 16: ...panel See picture below 8 Slip the nylon door skids on each of the bottom panels This may already have been done pri or to delivery After fitting the doors see later in the booklet you may need to lo...

Страница 17: ...17 DOOR FRAME ASSEMBLY...

Страница 18: ...les are fitted to the infill panel on each door choose between 1st or 2nd panel down Posi tion the handle centrally and mark the hole position Drill 7mm diameter holes 2 holes per door then fit the ha...

Страница 19: ...st The vent top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge uppermost 3 Slide the glazing beading into the beading groove in the vent side and vent to...

Страница 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...

Страница 21: ...olt and tighten up Key Point 5 The built in base attaches to the inside of the corner bar The bolt placed in the corner bar bolt slot at gable end assembly will slide down into the slotted hole at the...

Страница 22: ...osition thus preventing sideways movement of the vent N B There is no hole for the screw but it will easily push into the tube and screw up Key Point You only require one tube per vent on the left han...

Страница 23: ...ll glass retaining lip just above the combined eaves bar and gutter and be running parallel with the roof glazing bars Each corner must be the same If one corner is out of square the corner diagonally...

Страница 24: ...ides of the door opening and at tach the flat bars using the end with the larger hole leave finger tip tight Let the flat bar hang down then slide them left right until the smaller hole at the bottom...

Страница 25: ...vent the door from sliding past its opening you must fix 2 angle brackets to the door end assembly Insert a cropped head bolt into the bolt channel at the top of the left hand glaz ing bar viewed from...

Страница 26: ...nels will require a larger overlap of approx 20mm 3 Hook one overlap clip on the middle of the pane of glass Key Point 4 Offer the next pane of glass to the glazing bars resting it on the two clips of...

Страница 27: ...vre replaces one A The louvre must be sandwiched between the 610 x 140 and the A pane and must go on the rear gable horticultural glass application only Ref Width Length A 610 610 B 610 457 C 610 410...

Страница 28: ...r the position of the different sizes 5 The glass is clipped onto the frame in the same way as the horticultural glass is but use 8 clips per large pane You do not use stainless steel clips if you hav...

Страница 29: ...ref 13 with 610mm x274mm the louvre and 1 ref 18 The louvre must be sandwiched between the two panes of glass It must not sit directly onto the aluminium base cill Ref Width mm Length mm 12 457 1197 1...

Страница 30: ...r to the 1st if this 2nd finial over hangs the ridge by up to 25mm 1 you can move the 1st finial and crestings so there is an equal overhang of 12 5mm 1 2 Insert the small self tapping screw into the...

Страница 31: ...31 OPTIONAL EXTRA RAINWATER KITS...

Страница 32: ...32 ELITE 1803...

Отзывы: