12
DOOR END ASSEMBLY
From the main bag of fittings you will require the nuts and bolts, 2 eave plates and 1 ridge plate.
These are packed with the casement stay and are separate from the main bag of fittings.
Components
2 door end built in base
1 end glazing bars
2 side corner bars (unmarked)
1 top door track
2 door end horizontal angle
2 door end diagonal angle brace
1 main door track support
2 roof corner bars (marked “R”)
2 connecting plates
INSTRUCTIONS
1.
Assemble the frame in exactly the same way as the rear end, up to and including stage 3 of the
rear end. The difference with the door end is that instead of 1 long built in base piece, the door
end has 2 smaller pieces (1 either side of the door opening) and 1 door end cill.
2.
Now engage the door end cill with the 2 built in base pieces by pushing the angle of the cill
under the locator as shown in the diagram.
At this stage the cill will move freely left and right
but will remain located to the built in base. The cill has 2 holes punched in the upper flanges
approximately 300mm in from either end. When the cill is in the correct position, either end
of it is approximately 150mm in from the end of the two built in base pieces.
3.
Slide 2 bolts into the bottom of each glazing bar and 3 bolts (only 1 if greenhouse to be sited
on soft ground) into the free end of each built in base section. Attach the 2
nd
bolt in the
glazing bar to the hole in the door end cill, but do not put a nut on yet.
Remember, the door end glazing bars are 95 mm longer than the rear end ones and do not sit
on top of the base (as the rear end glazing bars do), they go down the side of the base and at-
tached to the bottom cill. (Key Point).
4.
Attach the door end connecting plate (with 3 holes) to the 2
bolts inserted in the glazing bars and the last bolt inserted into
the built in base ensuring that the glazing bar is tight down
into the angle of the door end cill. Attach the door end
diagonal brace to the top bolt of the door end connecting
plate. The 2 unoccupied bolts in the built in base sections will
be used to anchor the greenhouse to the floor and attach the
corner base leg.
5.
Attach the main door track support (shaped like a letter ‘Z’ to
be found with the door panels) to the two bolts that secure the
glazing bars to the corner bars.
(Key Point).
This ‘Z’ shaped
bar must be fitted with the two outside slots facing upwards
(as illustrated)
not
downwards.
6.
The two door end horizontal angles attach to the
top bolt
in the eave plate and the vertical
glazing bars.
Содержание STREAMLINE Series
Страница 1: ......
Страница 2: ...2...
Страница 3: ...3...
Страница 14: ...14...
Страница 17: ...17 DOOR FRAME ASSEMBLY...
Страница 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...
Страница 31: ...31 OPTIONAL EXTRA RAINWATER KITS...
Страница 32: ...32 ELITE 1803...