13
7.
Stand the frame up and bolt the door track to the main door track support by inserting 3 bolts
into the bolt slot of the door track. Position these through the 3 holes in the door track support
above the door opening.
8.
Position the main door track central to the greenhouse. When this has been achieved tighten
all nuts.
9.
Using the previously inserted bolt in the built in base, attach the corner bracket so that it is
pointing downwards. If you are fitting your greenhouse onto soft ground, then do not fit the
corner bracket yet. If you are on a patio, you will need to cut the bracket off level with the
bottom of the built in base and slide extra bolts into the bolt channel to be attached to the an-
chor bracket (generally 1 every 2’). If you are on soil, the corner bracket will go into the
ground at general assembly.
N.B.
Please note carefully the correct position of the main door support. The slotted holes at either
end are facing skywards NOT downwards. (
Key Point).
Please note, you only require approx. 40mm of beading in the inside ‘v’ groove of the end glazing
bars.
Содержание STREAMLINE Series
Страница 1: ......
Страница 2: ...2...
Страница 3: ...3...
Страница 14: ...14...
Страница 17: ...17 DOOR FRAME ASSEMBLY...
Страница 20: ...20 ASSEMBLY OF GREENHOUSE UNIT...
Страница 31: ...31 OPTIONAL EXTRA RAINWATER KITS...
Страница 32: ...32 ELITE 1803...