14
STEPS
— First please screw out the Knob (36) and Washer (37).
— Then hold the Aluminium guide rail (40) to the ver cal posi on.
— At last insert the Knob (77) and Washer (68) into the fi xa on hole. please see the picture as
following.
ATTENTION: PLEASE TAKE CARE WHILST FOLDING THE RAIL. ENSURE THE SEAT IS POSITIONED
TOWARDS THE FRONT OF THE RAIL.
STORAGE - FOLD UP DESIGN
Содержание Vanquish
Страница 1: ...Record serial number Elite Vanquish Rowing Machine ...
Страница 15: ...15 VANQUISH ROWING MACHINE ASSEMBLY MANUAL ...
Страница 24: ...24 EXPLODED DRAWING ...
Страница 25: ...25 VANQUISH ROWING MACHINE ASSEMBLY MANUAL ...