Pre-delivery Inspection:
It is quite necessary to carry out the preparation before
delivery.
Carry out this procedure each time before delivery for
the convenience of finding before putting the machine
into service whether there are any obvious errors.
Damaged or troubled machine shall not be used. It is
necessary to label and move away the machine if
finding damaged or abnormal machine.
The machine repair must be completed by the
competent repair personnel strictly according to the
repair manual.
Daily maintenance must be completed by the
competent operator according to the provisions of this
Manual.
Description:
Use the operation manual for this machine.
The preparation before delivery includes inspection
before delivery, maintenance procedures and
functional inspections.
Record the inspection results. If any inspection result
is N, it is necessary to stop the machine, repair the
machine and then re-inspect the machine, and mark R.
Notes:
Y—Yes, the machine is in good condition.
N—No, the machine has trouble.
R—Repaired, the machine has been repaired.
Record Form of Preparation before Delivery
Items
Y
N
R
Inspection before
Delivery
Maintenance Procedures
Functional Inspections
Model
Serial No.
Date
User
Signature of Inspector
Position of Inspector
Organization of Inspector
Attention
7
GTJZ0407SE
Maintenance Manual