background image

 

 

4.  Push the new light into the power box. 
5.  Connect the wiring to the LED terminals on the power 

board.  P3  -  red;  P4  -  black.  Route  the  wires  away 
from the high voltage wires or contacts. 

6.  Replace cover. 
7.  Return power to Air Cleaner. Test light. 

 
Replacing A Power Board 

Before replacing the power board, turn 

OFF

 power to 

the Air Cleaner at the source or remove the plug. 
1.  Remove the power box cover. 
2.  Disconnect wiring from the  LED, HV1, HV2 and 24 V 

terminals. Make note of position of wires. 

3.  Remove the three hex nuts from the power board. 
4.  Remove the power board from the studs. 
5.  Place the new board onto studs with the 24 volt input 

close to the transformer. 

6.  Replace the hex nuts removed in Step 3. Ensure the 

star  washer  is  in  place  over  the  steel  spacer  at  the 
ground  location  on  the  power  board.  For  proper 
grounding the  washer must be located on the top of 
the steel spacer, under the power board. 

7.  Reconnect  wiring  to  LED,  HV1,  HV2,  and  24  V 

terminals on the new power board. See Fig. 5. 

8.  Return power to Air Cleaner. Test power board. 
9.  Replace power box cover. 

Note:

  The power board has been set before shipping. It 

is  not  usually  necessary  to  reset  the  voltage  to  the  new 
load. If you do need to adjust the voltage refer to Setting 
Voltage of Power Board section for more information.

 

 

Testing Air Proving Switch (APS) 

The  APS  sensor  must  sit  in  the  plastic  bushing  to 

operate  correctly.

 

The  sensor  is  very  sensitive  and 

operation may be affected by cold ambient temperatures, 
an  air  exchanger,  or  a  fresh  air  duct  connected  to  the 
return air duct just upstream of the Air Cleaner. 

The  APS  uses  a  Triac  in  its  output  circuit,  which 

affects  the  voltage  sine  wave.  Using  a  regular  digital 
voltmeter may give a false reading. To check the output 
from the APS, use a true RMS (root mean square) meter 
to  measure  the  output  at  terminals  1  and  4  of  the  APS. 
The  output  should  be  between  105  and  115  VAC, 
depending on the airflow across the sensor. 

A 125 volt neon lamp may be used to test the output 

of the APS. Place the leads of the lamp across terminals 
1  and  4  of  the  APS.  If  the  lamp  lights,  the  voltage  is 
sufficient for operation. 

Do not use performance light.

 

When the Air Cleaner is turned on without airflow, the 

APS sensor heats up, and after 20-30 seconds opens the 
circuit to turn off the power board. When the fan starts up 
(the  sensor  is  cooled),  the  circuit  will  close,  the  power 
board  is  turned  on,  and  the  performance  light  will  come 
on. 

The  light  on  the  power  switch  will  be  lit  even  when 

the APS is open. 

 

 
 

If  the  power  board  fails  to  come  on  with  the  fan  on, 

check that the sensor is properly set down, to the bottom 
of  the  plastic  bushing,  in  the  front  of  the  power  box.  To 
check the APS for proper operation remove the collecting 
cells,  turn  the  unit 

ON

  without  the  fan  on.  The  power 

board  should  come  on  immediately,  and  then  turn  off  in 
20-30 seconds as the sensor heats up. To check sensor, 
blow  directly  on  it lightly. This should activate the  power 
board  within  10  seconds.  Service  the  sensor  carefully. 
The sensor leads are 120 V. If the APS does not turn the 
power  board  and  performance  indicator  on,  by-pass  the 
APS  by  placing  a  jumper  between  wires  3  &  4  on  the 
APS. This removes the APS from the circuit. 
See Troubleshooting Guide for more information. 

Note:

 If the air flow through the Air Cleaner is less than 

360 CFM the APS sensor may not have enough air flow 
to  activate  the  Air  Cleaner.  See  Wiring  for  information 
how  to  wire  the  Air  Cleaner  to  the  EAC  module  of  the 
system. In very  low  air applications the  Air Cleaner  may 
need to be wired through the EAC contacts and the APS 
disabled by connecting wires 3 & 4 together. 
If  there  is  no  EAC  module  or  it  is  not  powered  on  low 
speed then a relay will have to be installed to activate the 
Air Cleaner when the fan starts. The APS will have to be 
disabled. 
 

Replacing An Air Proving Switch (APS) 

Before replacing the APS, turn 

OFF

 the power to the 

Air Cleaner at the source.  
1.  Disconnect wiring from terminals 1, 2, 3, and 4 on the 

APS. See Fig. 5. 

2.  Remove the circuit board from the studs by removing 

the two nuts. Do not remove the spacers. 

3.  Install the new APS on the studs and secure with the 

nuts.  Ensure  sensor  protrudes  only  to  the  bottom  of  
the plastic bushing. 

4.  Connect  wiring  to  terminals  on  APS.  See  Fig.  5. 

Wiring  from  the  power  switch  is  connected  to 
terminals  2  and  3.  Wiring  to  the  transformer  is 
connected to terminals 1 and 4. 

5.  Test the new APS. 

 
Testing The 24 V Transformer  

1.  Remove power box cover. 
2.  Disconnect  the  leads  of  the  24  V  transformer  from 

the power board. See Fig. 5. Do not short leads. 

3.  The  Air  Cleaner  should  be 

ON

.  The  system  fan 

should  be  running  on  high  speed.  The  access  door 
should be closed. 

4.  Measure  voltage  across  the  leads  with  a  voltmeter. 

Voltage should read 25 - 28 VAC. 

5.  If no voltage is present, check operation of the APS. 
6.  Reconnect leads to the power board. 
7.  Replace power box cover. 

 
Replacing The 24 V Transformer 

Before  replacing  the  transformer,  check  the 

resistance across the power board  24 V  input terminals, 

Содержание EASASD-10ASC

Страница 1: ...rease mold fungi bacteria viruses and more down to 0 01 micron Dual Voltage Aluminum Collecting Cells are durable and easy to maintain Cell Guide ensures proper placement of collecting cells Activated...

Страница 2: ...of electrostatic precipitation Millions of airborne pollutants are carried through the return air ducts of the heating cooling system and treated through four stages of filtration The prefilters 2 re...

Страница 3: ...the Air Cleaner will vary with CFM and whether the carbon filters have been installed in the unit Location The Air Cleaner must only be installed in the return air duct as close to the fan compartment...

Страница 4: ...ifier must be installed as far from the Air Cleaner as possible 2 Collecting cells must be washed frequently to prevent a mineral deposit build up Installation Location With Air Conditioner Whenever p...

Страница 5: ...ent direction than the left to right set up The handle should face the door Close access door Wiring Wiring should only be performed by qualified personnel only All wiring must comply with all applica...

Страница 6: ...a non chlorine non corrosive non abrasive liquid household detergent Allow detergent to run down both sides of plates and ionizing wires Let stand for 5 minutes or fill up laundry tub with water and...

Страница 7: ...igh Voltage At Power Board A high voltage meter capable of measuring up to 10 000 VDC is required to test the voltage 1 The Air Cleaner should be ON with the cells installed the door closed and the sy...

Страница 8: ...e performance light will come on The light on the power switch will be lit even when the APS is open If the power board fails to come on with the fan on check that the sensor is properly set down to t...

Страница 9: ...ner 8 Remove the high voltage meter 9 Replace the power box cover 10 Turn ON the Air Cleaner Setting Approximate Voltage Without High Voltage Meter A high voltage meter should be used to set the high...

Страница 10: ...olding the power box to the cabinet 5 Slide the power box forward then up to remove it from the cabinet 6 If you are removing the power box for any length of time tape a cover over the top opening to...

Страница 11: ...options with power box 12 Carbon Filters Set of 3 1156 3 1156 3 1856 3 1856 3 13 Prefilter R0 0855 R1 0855 R2 0855 R8 0855 14 Cell Guide Plastic R1 0603 R1 0603 R1 0603 R1 0603 15 Collecting Cell D0 0...

Страница 12: ...making good connection on cell With needle nose pliers gently pull contacts down or replace contacts Cells arcing excessively power light and per formance indicator light ON or flashing Cells wet fro...

Страница 13: ...basis for the Air Cleaner to function at its peak of efficiency The frequency of cleaning will vary from one house to another On average the cells should be cleaned every 3 months Use the chart below...

Страница 14: ...NOTES 14...

Страница 15: ...pairing removing installing shipping servicing or handling of either defective parts or replacement parts Such costs may be covered by a separate warranty provided by the dealer LIMITATIONS OF WARRANT...

Страница 16: ...of the furnace or air handler ensure that there is 115 Volt output from these terminals when the unit is run manually and is running on low speed Some manufacturers do not supply full output voltage...

Отзывы: