background image

 

 

Installation Location With Humidifier 

A humidifier should be  installed in the furnace  warm 

air  duct.  However,  it  may  be  installed  in  the  return  duct 
without  causing  problems  to  the  Air  Cleaner.  Care  must 
be  taken  to  ensure  that  the  humidifier  does  not  leak,  as 
this may cause arcing  and a mineral deposit to  build up 
on the collecting cells. 

An  atomizing  type  humidifier  should  be  installed 

downstream  from  the  Air  Cleaner.  If  the  atomizing  type 
humidifier is installed upstream, high humidity, salts  and 
minerals  may  decrease  the  efficiency  of  the  collecting 
cells and cause service problems. 

If  the  atomizing  type  humidifier  must  be  installed 

upstream, the following precautions should be taken: 
1.  Atomizing  type  humidifier  must  be  installed  as  far 

from the Air Cleaner as possible. 

2.  Collecting cells must be washed frequently to prevent 

a mineral deposit build-up. 

 
Installation Location With Air Conditioner 

Whenever  possible,  the  Air  Cleaner  should  be 

installed  upstream  of  the  cooling  coil.  This  location  will 
clean the air before it reaches the evaporator coil. 

MODEL 

DIMENSIONS — in  (cm)  

 

EASASD-10ASC 

19.8 

(50.4) 

15.9 

(40.5) 

23.2 

(58.9) 

13.1 

(33.3) 

20.7 

(52.5) 

1.3 

(3.2) 

23.7 

(60.2) 

21.2 

(53.9) 

EASASD-11ASC 

19.8 

(50.4) 

15.9 

(40.5) 

26.1 

(66.3) 

13.6 

(34.6) 

24.1 

(61.2) 

1.0 

(2.5) 

26.6 

(67.7) 

25.8 

(65.4) 

EASASD-12ASC 

24.7 

(62.8) 

20.8 

(52.9) 

21.2 

(53.9) 

18.0 

(45.7) 

18.7 

(47.5) 

1.3 

(3.2) 

21.7 

(55.2) 

21.2 

(53.9) 

EASASD-18ASC 

24.7 

(62.8) 

20.8 

(52.9) 

25.8 

(65.4) 

18.0 

(45.7) 

23.3 

(59.1) 

1.3 

(3.2) 

26.3 

(66.8) 

25.8 

(65.4) 

Fig. 3 — DIMENSIONS 

Fig. 4 — AIR CLEANER INSTALLATION LOCATION 

Allow 24 in (600 mm) clearance for cleaning air cleaner.  Allow 6 in. (150 mm) clearance for power box removal.

 

Содержание EASASD-10ASC

Страница 1: ...rease mold fungi bacteria viruses and more down to 0 01 micron Dual Voltage Aluminum Collecting Cells are durable and easy to maintain Cell Guide ensures proper placement of collecting cells Activated...

Страница 2: ...of electrostatic precipitation Millions of airborne pollutants are carried through the return air ducts of the heating cooling system and treated through four stages of filtration The prefilters 2 re...

Страница 3: ...the Air Cleaner will vary with CFM and whether the carbon filters have been installed in the unit Location The Air Cleaner must only be installed in the return air duct as close to the fan compartment...

Страница 4: ...ifier must be installed as far from the Air Cleaner as possible 2 Collecting cells must be washed frequently to prevent a mineral deposit build up Installation Location With Air Conditioner Whenever p...

Страница 5: ...ent direction than the left to right set up The handle should face the door Close access door Wiring Wiring should only be performed by qualified personnel only All wiring must comply with all applica...

Страница 6: ...a non chlorine non corrosive non abrasive liquid household detergent Allow detergent to run down both sides of plates and ionizing wires Let stand for 5 minutes or fill up laundry tub with water and...

Страница 7: ...igh Voltage At Power Board A high voltage meter capable of measuring up to 10 000 VDC is required to test the voltage 1 The Air Cleaner should be ON with the cells installed the door closed and the sy...

Страница 8: ...e performance light will come on The light on the power switch will be lit even when the APS is open If the power board fails to come on with the fan on check that the sensor is properly set down to t...

Страница 9: ...ner 8 Remove the high voltage meter 9 Replace the power box cover 10 Turn ON the Air Cleaner Setting Approximate Voltage Without High Voltage Meter A high voltage meter should be used to set the high...

Страница 10: ...olding the power box to the cabinet 5 Slide the power box forward then up to remove it from the cabinet 6 If you are removing the power box for any length of time tape a cover over the top opening to...

Страница 11: ...options with power box 12 Carbon Filters Set of 3 1156 3 1156 3 1856 3 1856 3 13 Prefilter R0 0855 R1 0855 R2 0855 R8 0855 14 Cell Guide Plastic R1 0603 R1 0603 R1 0603 R1 0603 15 Collecting Cell D0 0...

Страница 12: ...making good connection on cell With needle nose pliers gently pull contacts down or replace contacts Cells arcing excessively power light and per formance indicator light ON or flashing Cells wet fro...

Страница 13: ...basis for the Air Cleaner to function at its peak of efficiency The frequency of cleaning will vary from one house to another On average the cells should be cleaned every 3 months Use the chart below...

Страница 14: ...NOTES 14...

Страница 15: ...pairing removing installing shipping servicing or handling of either defective parts or replacement parts Such costs may be covered by a separate warranty provided by the dealer LIMITATIONS OF WARRANT...

Страница 16: ...of the furnace or air handler ensure that there is 115 Volt output from these terminals when the unit is run manually and is running on low speed Some manufacturers do not supply full output voltage...

Отзывы: