![EL-CELL ECD-3-nano Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/el-cell/ecd-3-nano/ecd-3-nano_user-manual_2375074030.webp)
Page 30 of 46
User Manual
ECD-3-nano
Release 1.52
Finally, connect your potentiostat or battery tester to the 4 mm jacks on the front panel of the
controller box. Make sure that both instruments share a common ground (GND) potential.
Almost any potentiostat or battery tester can be used. The rightmost column in the table
below refers to the example of using a Biologic potentiostat (MPG-2, SP, VSP and VMP series).
Contoller Box
Potentiostat
Biologic Potentiostat, VSP, VMP3, etc.
I1
WE Current
WE
V1
WE Sense
Ref1
REF
Reference
Ref2
V2
CE Sense (if available)
Ref3
I2
CE
CE
GND
GND (if available)
GND
Before starting the electrochemical cycle we recommend holding the cell at constant potential
(or open-circuit) for several hours to allow for baseline stabilization. The initial rest period
helps to discern charging induced dimensional changes from the initial creeping.
NOTE:
All materials display a more or less pronounced creeping. They tend to shrink when
applying a load, and to swell when removing this load. A major contribution to the initial
creeping seen right after cell assembly is to be assigned to the construction materials of the
7.34
Open the shut-off valve in order to
connect the dead volume with the cell
volume. This prevents that the measured
displacement is affected by possible gas
evolution.
7.35
Example: Connecting a Biologic data
logger cable (available on request). View
the whole wiring on page 22.
Содержание ECD-3-nano
Страница 1: ... 2017 EL Cell GmbH 2021 EL Cell GmbH User Manual Release 1 52 Electrochemical dilatometer ECD 3 nano ...
Страница 39: ...Page 39 of 46 User Manual ECD 3 nano Release 1 52 Components Cell Body ECD3 00 0002 A ...
Страница 41: ...Page 41 of 46 User Manual ECD 3 nano Release 1 52 Central CE piston ECD 3 PE sealed screwed ECD3 00 0006 D ...