MAINTENANCE SCHEDULE
Notice!
The operating entity is obliged to ensure that all tests of the equipment are carried
out repeatedly at least once within every 24 months (EN 62353) or in intervals as
specified by the applicable national legal regulations. A report must be prepared on
the results of the tests (e.g.: according to EN 62353, Annex G), including the
measurement methods used.
Maintenance
Page
Time interval
To be
performed by
Clean air intake filter
13
At least once a week
Staff
Safety valve check
15
Once per year
Qualified expert
Replace filters in filter
16
Every 4000 hours
Qualified expert
Test the tightness of
joints and inspect the
equipment
15
After two years
Qualified expert
Replace piston
complete with piston
rings, O-rings and
bearing
Service
documentation
Every 8000 hours
Qualified expert
Replace suction filter
17
Every 8000 hours
Qualified expert
Perform “Repeated
Test” according to
EN 62353
14
1 x 2 years
Qualified expert
Service interval signalization
Once 4000 operating hours have been reached, the value “4000” starts to
appear as the outlet pressure from the equipment, alternating with the actual
outlet pressure value. They alternate about every 2 seconds. Once this
information appears, the operator is obliged to secure service work for the
equipment.
Safety valve check
The safety valve is adjusted to 7 bar by the manufacturer, then tested
and marked. It must not be readjusted.
Содержание DK50 DS
Страница 1: ......
Страница 8: ...EQUIPMENT DESCRIPTION NP DK50 DS 23_08 2018 7 ...
Страница 31: ...PRODUKTBESCHREIBUNG 30 NP DK50 DS 23_08 2018 ...
Страница 56: ...DESCRIPTION DE L EQUIPEMENT NP DK50 DS 23_08 2018 55 ...