background image

 

OPERATION 

 

 

NP-DK50-Nx2VTM-ADM-EN-1_06-2022 

36 

06/2022 

The following appears: 
 

  Press 

ESC

 

on 

the 

controller 

repeatedly  until  the  main  menu 
appears. 

 

Start the controller program as follows: 

 

press▲ or ▼ to  move the “>” cursor 
on the display to 

Start

 and press 

OK

 

to confirm 

 

 

 

Never press OK if the cursor “>” 
is  at  Program!  This  menu 
provides  access  to  windows 
with software functional blocks. 
Changes  to  the  parameters  in 
these  blocks  have  a  direct 
effect on the functionality of the 
equipment! 

Alarms and alarm signalling 

The  equipment  automatically  checks  the 
functionality of specific parts of the equipment 
and  indicates  when  maintenance  service  is 
needed.  The  controller  determines  an  alarm 
as  any  situation  in  which  the  equipment 
functionality  does  not  match  the  standard 
conditions.  

The  individual  alarms  are  indicated  by  an 
alarm  signal  indicated  by  an  activated  HA 
beacon  (29),  with  one  or  more  alarm 
messages on the controller's display. 

Alarms  are  classified  based  on  their  severity 
into: 

 

low  priority  alarms

 

–  signal  a 

maintenance interval           I = n x 2000 
hours  (n  =  1,  2,  3,  ..)  and  the 
equipment  supplies  air  to  the  central 
compressed  air  system  using  all  air 

pumps;  this  status  is  indicated  by  an 
activated  HA  beacon  and  a  message 
on the display. 

 

medium priority alarm

 

– triggered by 

a malfunction in one or more air pumps 
and the equipment supplies air to the 
central  compressed  air  system  using 
only functional air pumps; this status is 
indicated by a flashing HA beacon and 
message on the display. 

 

The 

equipment 

has 

an 

intelligent  alarm  system  that 
generates  an  alarm  signal 
based  on  its  priority  (medium 
priority  alarms  have  a  higher 
priority 

than 

low 

priority 

alarms) 

Low priority alarm conditions 

The  equipment  is  equipped  to  monitor  and 
signal  maintenance  intervals.  Maintenance 
intervals are whole number multiples of 2000 
operating hours I = n x 2000 hours (n = 1, 2, 
3,  etc.).  The  maintenance  of  specific 
components pursuant to the attached Table 2 
must  be  performed  once  a  maintenance 
interval is passed. This condition is indicated 
by  an  activated  yellow  HA  beacon  and  an 
information message on the display: 

 

 

 

 

Maintenance 

intervals 

are 

counted  from  the  moment  the 
equipment is first started up. 

This  table  must  be  inserted  into  the 
compressor maintenance log along with Table 
3  in  which  maintenance  work,  inspections  of 

Содержание DK 50 4X2VT/M

Страница 1: ...DK50 4x2VT M DK50 6x2VT M USER MANUAL EN...

Страница 2: ......

Страница 3: ...VT M EKOM spol s r o Priemyseln 5031 18 SK 921 01 Pie any Slovak Republic tel 421 33 7967255 fax 421 33 7967223 www ekom sk email ekom ekom sk DATE OF LAST REVISION 06 2022 NP DK50 Nx2VTM ADM EN 1_06...

Страница 4: ...NSTALLATION 22 10 INSTALLATION CONDITIONS 22 11 COMPRESSOR ASSEMBLY 23 12 PNEUMATIC CONNECTION 26 13 ELECTRICAL CONNECTION 28 14 COMMISSIONING 29 15 PNEUMATC DIAGRAMS 31 OPERATION 34 16 SWITCHING THE...

Страница 5: ...n Compressed air supplied by the compressor is unsuitable for use with artificial lung ventilation devices without further filtration Any other use of the product beyond its intended use is considered...

Страница 6: ...use Original packaging should be retained for the return of the device Only the original packaging ensures protection of the device during transport If it is necessary to return the product during th...

Страница 7: ...y use The user must be familiar with the operation of the device Do not use the product in environments with a risk of explosion The user must inform the supplier immediately if any problem directly r...

Страница 8: ...or the product If it is necessary to return the product during the warranty period the manufacturer is not liable for damages caused by improper packaging The compressor is shipped in a vertical posit...

Страница 9: ...022 PRODUCT DESCRIPTION 7 VARIANTS The compressor is manufactured according to its intended application in the following variants DK50 4x2VT M Composed of modules 1 compressor module with adsorption d...

Страница 10: ...119 004 FS 40S 1 0 01 604014119 024 FS 40AH 1 AC HC 0 01 604014119 005 These FS do not contain a filter bypass which will ensure a continuous flow of air when replacing the filter element Such a set m...

Страница 11: ...e trapped condensate into the surroundings Chamber operation desiccant regeneration is cyclically switched Dry and filtered air then passes through the non return valve into the air tank 2 Description...

Страница 12: ...PRODUCT DESCRIPTION NP DK50 Nx2VTM ADM EN 1_06 2022 12 06 2022 Fig 1 Compressor with adsorption dryer...

Страница 13: ...PRODUCT DESCRIPTION 06 2022 13 NP DK50 Nx2VTM ADM EN 1_06 2022 Fig 2 Adsorption dryer...

Страница 14: ...he pressure relief valve then closes as the pressure drops Pressure in the compressed air circuit can only increase because of an increase in flow resistance in the compressed air lines or as a result...

Страница 15: ...rical feeder mm2 4 Enclosure IP10 Motor power kW 1 2 Air tank volume l 220 Air quality filtration m Maximum operating pressure of safety valve bar 12 0 Noise level at 5 bar LpA dB 72 Operating mode S1...

Страница 16: ...TECHNICAL DATA NP DK50 Nx2VTM ADM EN 1_06 2022 16 06 2022 Dependence of compressor output on working pressure...

Страница 17: ...ion m Maximum operating pressure of safety valve bar 12 0 Noise level at 5 bar LpA dB 72 Operating mode S1 100 PDP drying performance at 7 bar d C 20 40 Time to fill air tank from 0 to 7 bar s 460 470...

Страница 18: ...of FAD Free Air Delivery applies to the following conditions Altitude 0 m n m Temperature 20 C Atmospheric pressure 101325 Pa Relative humidity 0 To calculate FAD compressor capacity in dependence on...

Страница 19: ...below The customer or the user of the equipment should assure that it is used in such an environment Emissions test Compliance Electromagnetic environment guidance RF emissions CISPR 11 Group 1 The e...

Страница 20: ...s connection Mains power quality should be that of a typical commercial or hospital environment Surge IEC 61000 4 5 1 kV differential mode 2 kV common mode 1 kV L N 2 kV L PE N PE Applied to mains con...

Страница 21: ...2 7 GHz where P is the maximum output power rating of the transmitter in watts W according to the transmitter manufacturer and d is the recommended separation dis tance in metres m Field strengths fro...

Страница 22: ...ressor see the Technical Data chapter The compressor on the operator s side must be at least 70 cm from the wall to allow air flow for cooling purposes and to ensure the safety of the operator and mai...

Страница 23: ...emove the transport anchors from the pallet All modules are secured to pallets Use a fork lift or similar hoisting equipment to handle and position the product Position the compressor module at the si...

Страница 24: ...INSTALLATION NP DK50 Nx2VTM ADM EN 1_06 2022 24 06 2022 Fig 5 Handling the compressor module...

Страница 25: ...INSTALLATION 06 2022 25 NP DK50 Nx2VTM ADM EN 1_06 2022 Fig 6 Levelling the compressor Fig 7 Frame installation...

Страница 26: ...es used to secure the aggregates once the compressor is installed and levelled at the site of final installation Fig 8 Releasing the air pumps Remove the transport stabilisers from the air pumps X Y Z...

Страница 27: ...he condensate drain directly to a waste drain Passers by may be injured Connect a hose to the outlet 1 from the automatic condensate drain 2 to the provided collection vessel Fig 10 Condensate drain A...

Страница 28: ...oduct is delivered without a power cord Cord type minimum requirements H05 VV F_ 5G10 Risk of electric shock Ensure full compliance with all local electrical codes The mains voltage and frequency must...

Страница 29: ...ct the loose cord to the pressure switch per the schematic or Fig 15 tighten the screws and secure with paint Fire hazard and risk of electric shock Ensure the electrical cable does not touch hot part...

Страница 30: ...tion vessel Check the date and time settings on the LOGO controller see chap 16 1 Configuring the language on the dryer display see chap 19 2 Configuring the date and time on the dryer display see cha...

Страница 31: ...INSTALLATION 06 2022 31 NP DK50 Nx2VTM ADM EN 1_06 2022 15 PNEUMATC DIAGRAMS DK50 4x2VT M...

Страница 32: ...INSTALLATION NP DK50 Nx2VTM ADM EN 1_06 2022 32 06 2022 DK50 6x2VT M...

Страница 33: ...mpressor fan 4 Solenoid valve 5 Safety valve 6 Non return valve 7 Pressure relief valve 8 Condensate separator 9 Dryer 10 Pressure switch 11 Pressure gauge 12 Cooler 13 Cooler fan 14 Air tank 15 Conde...

Страница 34: ...ure ambient temperature 30 C or inlet air temperature of 100 C Required drying performance can only be achieved when following the defined operating conditions Drying performance will decline and the...

Страница 35: ...ed The controller is unable to archive time and data if it is disconnected from the power for more than 80 hours This data must be configured when the equipment is first placed into service or after a...

Страница 36: ...n 1 2 3 and the equipment supplies air to the central compressed air system using all air pumps this status is indicated by an activated HA beacon and a message on the display medium priority alarm tr...

Страница 37: ...signalled by a flashing HA beacon P1 and an the following message appears on the display The beacon will continue to flash after the air pump malfunction is remedied Turn off the alarm by pressing an...

Страница 38: ...ng cycle Working pressure is in chamber 1 and the chamber is in the drying phase while there is atmospheric pressure in chamber 2 and this chamber is in the regeneration phase The chamber is regenerat...

Страница 39: ...lected mode The program adjusts the chamber pre filling in the given mode Symbol expressing the ambient temperature over 30 C related to the selected mode The program adjusts the chamber pre filling i...

Страница 40: ...E N T E R CONFIRM THE LANGUAGE CZECH LANGUAGE SETUP 19 3 Setting the date and time during commissioning It is recommended to set the date and time during commissioning These settings are changed in th...

Страница 41: ...en opens once the user interface language and drying mode are set There are 4 main screens accessed from the home screen The arrows at the bottom of the screen are used to navigate between the individ...

Страница 42: ...ryer operating hours indicator is located at the top of the screen The dryer operation screen is also divided into 4 tiles which describe the dryer chamber working cycles using a graphical depiction o...

Страница 43: ...s The compressor beacon does not light up in the event of a fault in the adsorption dryer 21 1 Notification Upcoming service interval 100 operating hours prior to the next service interval a yellow no...

Страница 44: ...dryer is not operating normally regeneration is not initiated the compressor must be shut down A high dew point alarm may appear when the unit is first placed into service The alarm will persist unti...

Страница 45: ...trained personnel Only use manufacturer approved replacement parts and accessories Danger of injury or equipment damage Prior to commencing compressor maintenance it is necessary to check if it is po...

Страница 46: ...em parts of the dryer and connecting hoses between the compressor and dryer may be hot do not touch these components Allow the equipment to cool down before maintenance service or connecting disconnec...

Страница 47: ...e service manual 22 4 22 9 22 7 22 6 16000 h 12000 h x x x x 10000 h x x x 8000 h x x x 6000 h x x 4000 h x x x 2000 h x x Once every 2 years x Once a year x Once a week x Once a day x Time interval C...

Страница 48: ...ee the service manual See the service manual 22 8 22 3 20000 h x 16000 h 12000 h x x 10000 h x x 8000 h x x 6000 h x x 4000 h x x x 2000 h x x Every 2 years Once a year Once a week Once a day Time int...

Страница 49: ...p for normal operation and noise levels Fan operation check the fans must be running during the defined compressor work cycles Check the filter condition clean dirty filters or replace with new filter...

Страница 50: ...least once a day Fig 16 Check of the condensate collection vessel 22 6 Inlet filter replacement The filters located in the compressor air pump enclosure cover must be replaced at defined intervals Int...

Страница 51: ...mance check Turn off the compressor using the STOP button Vent the air pressure in the air tank to zero Turn on the compressor using the START button Measure the time to fill the air tank from 0 to 7...

Страница 52: ...ala com and then navigate to the Services section and select Calibration and repair services Then enter the type of sensor sensor type DMT143 and select a calibration type then follow the provided ins...

Страница 53: ...ck mains voltage Check the function of the contactor and thermal relays replace if damaged Loose terminals at the motor terminal strip tighten or replace if damaged or broken Motor winding shorted dam...

Страница 54: ...ed air source fix any leaks in the distribution system Regeneration solenoid valve not working Check coil operation replace if damaged Air regeneration nozzle plugged Clean or replace the nozzle see p...

Страница 55: ...to connected downstream equipment 25 REPAIR SERVICE Warranty and post warranty repairs must be done by the manufacturer its authorized representative or service personnel approved by the supplier Att...

Страница 56: ...l alarms operation in alarm conditions Y N N Installation connection to equipment Y Product maintenance maintenance intervals maintenance procedure service intervals operating activities Y N N Functio...

Страница 57: ......

Страница 58: ......

Страница 59: ......

Страница 60: ...NP DK50 Nx2VTM ADM EN 1_06 2022 112000595 0001...

Отзывы: