EIPL 1028225 Скачать руководство пользователя страница 4

 
 
 

PD120 OWNERS MANUAL 

Drawing No.  :-  TPC368 
Issue 

:-  6 

Date 

:-  07/09/18 

INSTALLATION

    

 
 
POSITIONING:  
 

Position  the  dehumidifier  unit  in  the  center  of  the  room  to  be  conditioned  if  at  all  possible. 
However if a damp patch is particularly apparent the outlet grille should be pointed towards it if 
possible. 
 
This  unit  can  also  be  used  in  a  duct  system  where  applicable,  please  see  the  diagrams  on  the 
following pages which identify the overall sizes of the unit and also the mounting points. 
 
NOTE: Both inlet grille and outlet grille of the dehumidifier unit must have clear space around 
them  and  not  be  obstructed  in  anyway. 

For  correct  installation  and  operation the unit inlet 

and outlet must have a clearance of 0.5M from all adjacent surfaces and or structures.

 

 
 
Before connecting this unit to the relevant power supply the following must be carried out. 
 
Selecting the correct fan speed – The PD120 has a low fan speed and a high fan speed and the 
required speed must be chosen before installation. To select the correct fan speed firstly remove 
the air outlet cover via the 10off M4 hex head bolts, then remove the electrical box cover via the 
4off M4 hex head bolts. Once the electrical box cover is removed the supplied link wire must be 
wired between either the ‘C’ and ‘L’ or the ‘C’ and ‘H’ terminals on the terminal block. This is 
shown below. 
 
 

 
 

 

 

    

 

   

 

 

 

Before the unit will switch on it must have a low voltage humidistat wired into it with the NC 
contacts wired to the terminal block inside the electrical box as shown below. 
 
 

 

   

 

 

 
 
 
 
 
 

Содержание 1028225

Страница 1: ...PD120 OWNERS MANUAL Drawing No TPC368 Issue 6 Date 07 09 18 EBAC MODEL PD120 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL www eipl co uk...

Страница 2: ...s the moist air through the cold evaporator coil which cools the air below its dew point Moisture forms on the evaporator coil and is collected in the condensate tray which is equipped with a permanen...

Страница 3: ...TH EPTH EPTH 658mm W W W WEIGHT EIGHT EIGHT EIGHT 70 5Kg A A A AIR IR IR IRFLOW FLOW FLOW FLOW Low 450 M3 hr High 850 M3 hr H H H HORSEPOWER ORSEPOWER ORSEPOWER ORSEPOWER 1 5 P P P POWER OWER OWER OWE...

Страница 4: ...unit inlet and outlet must have a clearance of 0 5M from all adjacent surfaces and or structures Before connecting this unit to the relevant power supply the following must be carried out Selecting t...

Страница 5: ...running for 15 minutes E Observe the evaporator coils behind the filter on the air inlet end of the unit to confirm frost formation i If the air temperature is below 70 F an even coating of frost shou...

Страница 6: ...the fins Alternatively vacuum clean the coils WARNING DO NOT STEAM CLEAN REFRIGERATION COILS 2 Check that the fan is firmly secured to the motor shaft and that the fan rotates freely The fan motor is...

Страница 7: ...of the refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valves to be fitted to any part of the circuit Service valves may leak cau...

Страница 8: ...on 4 Check the wiring diagram to find fault and repair Little or no water extraction 1 Insufficient air flow 2 Compressor fault 3 Loss of refrigerant gas 1 Check all of the above 2 Contact the Factory...

Страница 9: ...azard This product contains fluorinated greenhouse gases covered by the Kyoto Protocol The refrigeration system is hermetically sealed The Global Warming Potential GWP of refrigerants used in products...

Страница 10: ...90 www eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport News Virginia 23606 2575 USA Tel 01 757 873 6800 Fax 01 757 873 3632 www...

Отзывы: