OPERATION
The following procedures should be followed to test the ECO85 for correct
operation:
1.
After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded electrical outlet. Connect the drainage
outlet to a suitably sized hose and run the hose to a permanent
drain.
2.
Check dehumidification process as follows:
A. Place unit on a level surface.
B. Start up unit by connection to mains supply and switching the on
off switch to the ‘I’ position.
C. Check that the compressor is running.
D. Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the evaporator filter panel
i. If the air temperature is below 80° F, an even coating of
frost should cover the entire evaporator coil
ii. If the air temperature is above 80° F, frost and/or droplets
of condensed water should cover the entire
evaporator coil.
F.
After continuous running time of approximately 55 minutes, the
unit will enter “Hot Gas” defrost mode for 5 minutes and then
automatically return to normal operation.
If, after carrying out the above procedures, the unit does not appear to
function properly, refer to the
Trouble Shooting
section, which follows,
or contact the Factory Service Center.
After using the ECO85, turn it off for 5 minutes to allow the condensate on the
coils to drain into the pump reservoir, then turn it back on and press the
momentary purge switch for twenty to thirty seconds to evacuate the water
from the pump reservoir.
TO ENSURE CONTINUED FULL EFFICIENCY OF THE
DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE
PERFORMED AS FOLLOWS:
CAUTION:
ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT
LEAST FIVE MINUTES BEFORE RESTARTING.