GB
9
of any kind caused as a result of this.
Please note that our equipment has not been
designed for use in commercial, trade or industrial
applications. Our warranty will be voided if the
machine is used in commercial, trade or industrial
businesses or for equivalent purposes.
Repairs and maintenance work are to be carried out
only by authorized specialist workshops.
Please note!
The power of the tool will be reduced if you use a
hose that has too small an inner diameter or
which is too long.
4. Technical data
Permissible working pressure max.:
6.3 bar
Idle speed:
22,000 min
-1
Air consumption (6.3 bar):
128.3 l/min
Recommended hose diameter:
Ø 10 mm
Weight:
0.65 kg
Sound and vibration
Sound and vibration values were measured in
accordance with EN 792-9.
L
pA
sound pressure level
93.8 dB(A)
K
pA
uncertainty 3
dB
L
WA
sound power level
83.5 dB(A)
K
WA
uncertainty 3
dB
Wear ear-muffs.
The impact of noise can cause damage to hearing.
Total vibration values (vector sum of three directions)
determined in accordance with EN 792-9.
Vibration emission value a
h
< 2.5 m/s
2
K uncertainty = 1.5 m/s
2
Keep the noise emissions and vibrations to a
minimum.
Only use appliances which are in perfect working
order.
Service and clean the appliance regularly.
Adapt your working style to suit the appliance.
Do not overload the appliance.
Have the appliance serviced whenever
necessary.
Switch the appliance off when it is not in use.
Wear protective gloves.
Air quality
cleaned and oiled
Air supply
via conditioning unit with filter pressure reducer
and mist oiler
Compressor capacity
approx. 250 l/min. equivalent to a motor rating of 2.2
kW
Work settings
6 bar working pressure set at the pressure
reducer or filter pressure reducer
Please note:
When working with the pin grinder, be sure to
wear the necessary protective clothing. Observe
the safety regulations.
5. Putting into operation
Screw the supplied plug-in nipple into the air
connection after you have wound 2 to 3 layers of
sealing tape around the thread. Insert adapter sleeve
size Ø 3 mm or Ø 6 mm depending on which
grinding pin you want to use. To do so, unscrew the
lock nut, insert the adapter sleeve and re-tighten the
lock nut by hand. Then insert the correct grinding pin
(make sure it has the correct shaft diameter!) and
tighten the lock nut with the two chuck keys, using
the one key to hold the adapter sleeve mount.
6. Maintenance and cleaning
Observance of the following maintenance
instructions will ensure that this quality tool gives you
years of troublefree service.
Regular lubrication is vital for the long-term, reliable
operation of your pin grinder. Use only special tool oil
for this purpose.
You can choose from the following options for
lubricating the tool:
6.1 By mist oiler
A complete conditioning unit includes a mist oiler and
is fitted to the compressor.
Anleitung_DSL_250_2_SPK7:_ 22.03.2012 8:14 Uhr Seite 9
Содержание Druckluftset Profi 11011
Страница 2: ...2 1 2 b 3 4 7 5 6 5 3 2 2 6 c 1 4 Anleitung_4132727_SPK1 _ 19 03 2012 15 12 Uhr Seite 2...
Страница 29: ...29 CZ Anleitung_4132727_SPK1 _ 19 03 2012 15 12 Uhr Seite 29...
Страница 46: ...2 1 F E D K I C G H 2 3 A B M N O G Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 19 Uhr Seite 2...
Страница 47: ...3 4 5 6 7 2 G 1 8 F J I Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 3...
Страница 108: ...64 GR Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 64...
Страница 109: ...1 10 8 bar 65 GR Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 65...
Страница 110: ...A O 1 2 3 B 4 2 1 8 B C D F G I J K 3 2 M 3 mm 4 mm 4 66 GR Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 66...
Страница 114: ...10 70 GR Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 70...
Страница 118: ...74 Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 74...
Страница 119: ...75 Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 75...
Страница 120: ...76 Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 76...
Страница 130: ...86 z 1 2 12 3 2 4 Anleitung_DTA_25_2_SPK7 _ 22 03 2012 7 20 Uhr Seite 86...
Страница 134: ...2 1 4 5 3 1 2 Anleitung_DSL_250_2_SPK7 _ 22 03 2012 8 14 Uhr Seite 2...
Страница 175: ...43 GR Anleitung_DSL_250_2_SPK7 _ 22 03 2012 8 14 Uhr Seite 43...
Страница 176: ...1 H 20 min 1 1 2 1 1 2 3 44 GR Anleitung_DSL_250_2_SPK7 _ 22 03 2012 8 14 Uhr Seite 44...
Страница 190: ...58 z 1 2 12 3 2 4 Anleitung_DSL_250_2_SPK7 _ 22 03 2012 8 14 Uhr Seite 58...
Страница 194: ...2 1 1 6 2 4 5 9 7 8 2 3 6 Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 46 Uhr Seite 2...
Страница 195: ...3 3 4 A Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 46 Uhr Seite 3...
Страница 262: ...70 GR Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 47 Uhr Seite 70...
Страница 263: ...1 2 71 GR Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 47 Uhr Seite 71...
Страница 264: ...72 GR Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 47 Uhr Seite 72...
Страница 268: ...8 9 9 1 9 2 www isc gmbh info 10 N 5 30 C 11 76 GR Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 47 Uhr Seite 76...
Страница 272: ...80 Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 47 Uhr Seite 80...
Страница 282: ...90 z 1 2 12 3 2 4 Anleitung_DSS_260_2_SPK7 _ 22 03 2012 10 47 Uhr Seite 90...
Страница 286: ...2 1 5 2 3 4 2 1 5 10 6 7 8 9 4 Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 03 Uhr Seite 2...
Страница 287: ...3 3 2 3 1 Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 03 Uhr Seite 3...
Страница 350: ...66 GR Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 03 Uhr Seite 66...
Страница 351: ...1 5 2 67 GR Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 03 Uhr Seite 67...
Страница 352: ...68 GR Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 03 Uhr Seite 68...
Страница 356: ...11 72 GR Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 04 Uhr Seite 72...
Страница 360: ...76 Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 04 Uhr Seite 76...
Страница 370: ...86 z 1 2 12 3 2 4 Anleitung_DMH_250_2_SPK 7 _ 22 03 2012 9 04 Uhr Seite 86...
Страница 374: ...2 1 2 3 d 4 5 3 4 3 2 Anleitung_4139695_SPK1 _ 19 12 2011 8 55 Uhr Seite 2...
Страница 397: ...25 Anleitung_4139695_SPK1 _ 19 12 2011 8 55 Uhr Seite 25...