7
Door frames
Remove this
part
PVAC glue (D3)
For wooden door frames, we recommend undercutting them – with the approval of the customer – according to the thickness of
the flooring and the underlay.
Install the flooring underneath the door frame – leave the necessary expansion gaps. In the event that your installation job will
end underneath a door frame, we recommend that the locking part is removed from the protruding groove of the pre-installed
panel with a chisel. The newly installed panel can then be pushed horizontally over the groove of the previously installed panel.
This connection area has to be glued with a PVAC glue.
If you have a door frame that cannot be shortened, e.g., one made of metal, we recommend that you close or cover the expansion
gaps with sealant or suitable end profiles.
= +
16 mm
a
b
c
Floor profiles
Install the required flooring profiles and the skirtings after the laminate flooring has been installed in the correct way as described
above. Simple assembly instructions are enclosed with all the accessories.
Attention!
With most types of profile, the base (sub-profile) taking the cover profile must be installed prior to installing the laminate
floor.
Installation