background image

6

Removal / Dismantling of Elements

In order to replace installed panels without destroying them, you first have to unlock the entire row by tilting it and then offset the 
panels at the short ends while tilted. Proceed with due care in order to avoid damaging the tongue and groove.

a

b

c

a

b

a

b

Class 31, 32 and 33 Commercial Applications

PVAC glue (D3)

PVAC glue (D3)

In industrial areas you have to anticipate extraordinary exposure to moisture. As a result, additional sealing with PVAC glue (D3) is 
mandatory for such applications. Apply the sealing glue to the top of the tongue on the short and long edge. The glue should ooze 
out along the complete long and short edge after the panels have been connected together. Excess sealing glue is easy to remove 
from the surface immediately or after a short drying period. 

Attention!

 Ensure that the elements below the sealing glue are installed without a gap.

Built-in kitchens/built-in cabinets

Built-in kitchens and built-in cabinets should be assembled prior to installation and the laminate floor should be laid under the 
plinth panel.

Pipes

1

3

2

4

 

ƒ

Measure the position of the pipes and mark it on the panel (allow for edge joint).

 

ƒ

Drill at least 16 mm more than the diameter of the pipe.

 

ƒ

Saw to the holes at a 45° angle.

 

ƒ

Fit and glue the sawn piece. 

Installation

Содержание JUSTclic!

Страница 1: ...Installation instructions Egger Laminate Flooring with JUSTclic installation system...

Страница 2: ...e of fast setting screed the measurements and limitis specified by the respective manufacturer shall apply The test material must be obtained from the lower one third of the screed During this process...

Страница 3: ...cting the function of the floor heating cooling system functional heating cooling Proof of the proper raising and lowering of the temperature of the heated screed structure in any season must be provi...

Страница 4: ...nate flooring with laminated Silenzio underlayer board on the reverse An additional insulation underlay is not permitted in this case 3 Before the installation Acclimatisation of the floor boards The...

Страница 5: ...observing the required gaps placing the spacers Figure 3 to 10 Start installing the 2nd row with the remaining panel of the 1st row if the latter is at least 200 mm long In the following rows the new...

Страница 6: ...to the top of the tongue on the short and long edge The glue should ooze out along the complete long and short edge after the panels have been connected together Excess sealing glue is easy to remove...

Страница 7: ...an then be pushed horizontally over the groove of the previously installed panel This connection area has to be glued with a PVAC glue If you have a door frame that cannot be shortened e g one made of...

Страница 8: ...exception of Aqua Laminate Flooring Only clean the laminate floor with a damp cloth Never use abrasives or scouring agents on the laminate floor Do not use cleaning products that may leave a residue...

Страница 9: ...41 301 20222 flooring egger com EGGER Drevprodukt Gagarin Ezhvinsky proezd 1 215010 Gagarin Oblast Smolensk Russia T 7 48135 79 300 F 7 48135 79 311 info ru egger com BR_flo_EGGER_installation_instruc...

Отзывы: