![EGAmaster 79617 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/egamaster/79617/79617_operating-instructions-manual_2367692006.webp)
6
- Connect pneumatic hose. (Before connecting, it is recommended to blow out the hose and thus
remove impurities).
- Actuate valve and press sensor button. (Only after pressing the sensor button, the channel is
opened. When the valve is closed, the sensor shuts as well. When the valve is opened again, the
sensor button has to be pressed again as well.)
- Start cutting.
- Ensure appropriate cooling (water) of tool and working piece.
AFTER FINISHING THE SAWING WORK
- Shut valve
- Shut compresse air supply and disconnect air hose.
- Take saw out of the device.
- Clean saw and retainer seat.
- Check oiler
MAINTENANCE INSTRUCTIONS
Our pneumatic motors are designed for an operation pressure of 4 -6 bar (65-90 PSI).
Service life and performance of the machines are decisively determined by:
a) The air purity
Blow the air hose clear before connecting it to the machine. Install dirt and water separator
upstream of the machine, if it is not possible to prevent the formation of rust and water
condensation in the air distribution lines.
b) The lubrication conditions and maintenance
see “Maintenance of pneumatic tools“
The proper quantity of grease is very important from the point of good lubrication and low heat
generation. The grease quantities listened in the following table must be complied with:
Grease
Quantity in grams
In the crank casing
100
In the bevel gears
40
In the spur gears
30
Содержание 79617
Страница 12: ...12...
Страница 17: ...17...
Страница 19: ...19...
Страница 21: ...21...
Страница 23: ...23...
Страница 27: ...27...
Страница 39: ...39...
Страница 44: ...44...
Страница 46: ...46...
Страница 48: ...48...
Страница 50: ...50...
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......