
21
ENGLISH
FIRST IGNITION (COMMISSIONING)
PHASES
• Make sure you have read and understood this
manual.
• Remove all flammable materials from the appliance
(manuals, labels, etc.). In particular remove any
labels from the glass.
• Make sure that the technician performs the first
ignition and the first loading of the pellet tank.
Refer to the “Various Menus” chapter, paragraph
“pellet loading”.
LOADING THE PELLETS INTO THE TANK.
To access the tank, open the lid.
When the boiler stove is hot, DO NOT
MAKE CONTACT between the pellet bag
and the top grille.
Use the provided gloves when loading the
stove while it is operating and hence hot to
the touch.
Make sure not to touch the smoke
discharge pipe if hot.
FUEL
Use UNI EN ISO 17225-2 category A1 wood pellets
or similar regulatory products with the following
characteristics.
diameter 6 mm
length 3-4 cm
humidity <10 %
For reasons of safety and environmental compatibility,
DO NOT burn plastic, painted wood, coal, bark or
other such materials in the stove.
Do not use the stove as an incinerator.
Caution
Using fuels other than those specified can
damage the appliance
INTRODUCTION ABOUT USE
On first ignition, there may be a slight
smell of paint, which will disappear in a
short time.
USER
VENT
During normal operations the vent is
automatic. The need for a manual vent for
the system can only be assessed by the
technician during commissioning.
Содержание MILLA H 12
Страница 1: ...EN Installation use and maintenance page 2 MILLA H 12 PELLET BOILER STOVE...
Страница 12: ...12 ENGLISH INSTALLATION EATING CONFIGURATION INSTALLER...
Страница 13: ...13 ENGLISH INSTALLATION BOILER CONFIGURATION INSTALLER...
Страница 14: ...14 ENGLISH INSTALLER INSTALLATION PUFFER CONFIGURATION...
Страница 41: ...41 ENGLISH...
Страница 42: ......
Страница 43: ......
Страница 44: ...code 942028 GB 03 19 A w w w e d i l k a m i n c o m 942028 GB...