
19
ENGLISH
CHECKING THE ELECTRICAL
CONNECTIONS (the power socket must be
located in an easily-accessible position)
The product is supplied with an electrical power cord
for connection to a 230V 50 Hz socket, preferably one
equipped with a trip switch.
Variations in voltage of more than 10% can compromise
its operation.
The electrical system must be compliant; check the
operation of the earth in particular.
Edilkamin is not responsible for malfunctions resulting
from an improperly earthed system.
The power line must be of adequate section for the
power of the appliance.
The power cable must not come into contact with the
flue or other hot parts of the stove.
Power up the product by setting its switch from 0 to 1.
There is one 4 A fuse on the socket with switch located
at the rear of the product.
INSTALLER
power supply
switch
fuse housing
INSTALLATION
Содержание MILLA H 12
Страница 1: ...EN Installation use and maintenance page 2 MILLA H 12 PELLET BOILER STOVE...
Страница 12: ...12 ENGLISH INSTALLATION EATING CONFIGURATION INSTALLER...
Страница 13: ...13 ENGLISH INSTALLATION BOILER CONFIGURATION INSTALLER...
Страница 14: ...14 ENGLISH INSTALLER INSTALLATION PUFFER CONFIGURATION...
Страница 41: ...41 ENGLISH...
Страница 42: ......
Страница 43: ......
Страница 44: ...code 942028 GB 03 19 A w w w e d i l k a m i n c o m 942028 GB...