PRELIMINARY CHECKS
Before commissioning the appliance, check that:
- The on-off devices in the water circuit are open
- The water circuit has been vented.
- The flues and combustion air intake openings have been developed correctly.
COMMISSIONING
To ignite and load the appliance for the first time:
- Completely open the flue gas damper (1) (horizontal
position)
- Set the draught register (2) to 40°C
- Move the secondary air register (3) to the middle position
- Adjust the primary air damper (4) so as it is open a couple
of millimetres at the bottom (minimum opening) using the
screw (5). Lock it in place with the lock nut
- Open the loading door (6), place small pieces of paper and
dry wood on the bottom of the chamber and ignite them
- Wait for them to ignite, complete the load, and then close
the loading door (6)