
- 14
-
INST
ALLA
TION
IAF
MI
CENTRAL HEATING
FLOW OUTLET
CENTRAL HEATING
RETURN INLET
RI
1
9
4
5
6
1
3
1
1
1
1
1
1
1
1
1
2
3
7
8
10
10
10
11
1 Disconnect valve
2 Pumps
3 Non-return valves
4 Outlet manifold
5 Return manifold
6 Open expansion vessel
7 Pressure reducer
8
Filter/softener
9 Pump to prevent condensation
10 Drains
11 Probe for optional pump to
prevent condensation
MI
Central heating flow outlet
RI
Central heating return inlet
IAF Cold water inlet
Diagram 1: ENERGY boiler connected directly to the systems
IAF
MI
CENTRAL HEATING
FLOW OUTLET
CENTRAL HEATING
RETURN INLET
RI
5
6
2
1
1
1
7
8
4
1
1
1
1
1
1
1
1
2
3
3
9
9
1
9
1
9
10
11
12
Diagram 2: ENERGY boiler, with energy accumulator to supply the systems
1 Disconnect valve
2 Pumps
3 Non-return valves
4 Outlet manifold
5 Return manifold
6 Open expansion vessel
7 Pressure reducer
8
Filter/softener
9 Drains
10 Energy accumulator
11 Vent valve
12 Optional min. temp. probe for
starting the pump
MI
Central heating flow outlet
RI
Central heating return inlet
IAF Cold water inlet
PRINCIPLE DIAGRAM
Содержание ENERGY 21
Страница 3: ...3 GENERAL...
Страница 31: ......