19
12 -GENERAL INSTRUCTIONS
FILLING SYSTEM WITH WATER
Close air vents on all radiation units. Open valves
•
to these units.
Verify boiler and expansion tank drain valves are
•
closed.
Air bleed screw on tank drain
fi
tting should be
•
closed.
Open valve in line from boiler to expansion tank.
•
Open water inlet to your boiler and leave it open.
Start with lowest radiation unit. Open air vent
on this unit. When all air has escaped and water
starts to
fl
ow from vent, close it.
Go to next radiation unit, and repeat this process.
•
Repeat until you have covered every radiation
units in the system (ending up at highest unit in
system).
If your units have automatic vents, manual
•
venting is unnecessary but it will speed up the
proper
fi
lling of your system.
If your system is closed expansion tank
•
system, you may leave it open to re
fi
ll system
automatically as needed.
Check temperature pressure gauge. Not position of
•
hand indicating pressure. This should be between
10 and 15 psi. Any lowering of this movable hand
below 10 psi. Will indicate loss of water due to
leakage. Automatic
fi
ll valve should compensate
for this. Instructions are packaged with the valve.
NOTICE
Never run water in a hot empty boiler.
Содержание Columbia MCC II Series
Страница 17: ...17 11 WIRING DIAGRAMS Figure 13 Integrated High Limit Electronic Ignition Control 240008781 ...
Страница 18: ...18 11 WIRING DIAGRAMS Figure 14 Integrated High Limit Electronic Ignition Control 240008781 ...
Страница 32: ...COLUMBIA BOILER COMPANY Main offices and factory Pittstown PA ...