15
INSTRUCTION MANUAL ECOSOFT
®
MEDIA SYSTEMS
5
. Place the brine tank beside the FRP tanks. Install flexible tube in both control valves’
brine inlets, join them with a tee connector and run a third piece of flexible tube from the tee
to the brine tank. Remove tank lid and brine well cap, pull the end of the tube inside and
connect it to the brine valve, then re-assemble in reverse order. Fill the brine tank with salt.
6
. Mount the pipe thread elbow adapters to the control valve’s In and Out ports and tighten
the coupling nuts. Do not put any mechanical load on fittings or use them to support pipes.
Connect both filters to water supply via In ports without turning on the water supply. Connect
the Out ports to MAV’s A and B ports. Then connect port C of the MAV to the downstream
pipework. Do not confuse In and Out ports. They are embossed with direction arrows.
Ecosoft DFU Twin/DFK Twin system setup
MOTOR
,
12VAC
, and
METER
cords are not shown but must be plugged in for proper functioning of each
filter. Both control valves must be programmed for Twin operation as provided in the following section.
TREATED
WATER
OUT
RAW
WATER
IN
PORT C
PORT A
PORT B
LEAD TANK
RESERVE TANK
Содержание FK Series
Страница 41: ......
Страница 75: ...75 РУКОВОДСТВО ПО МОНТАЖУ И НАСТРОЙКЕ СИСТЕМ ОЧИСТКИ ВОДЫ ECOSOFT ...
Страница 85: ......
Страница 86: ...NOTES ДЛЯ НОТАТОК ДЛЯ ЗАМЕТОК ...
Страница 87: ...NOTES ДЛЯ НОТАТОК ДЛЯ ЗАМЕТОК ...
Страница 88: ...ecosoft com ...