Running Test and operation

2.Running test

This running test must be performed by professional staff!

Overall test can be run if the entire system inspection is conformed to regulations.

Connected to power, start the heat pump, host unit delays three minutes then auto-start.

        For three-phase power supply unit, first check whether the fans and  pumps' rotary
        direction correct or not, if not, immediately  shut down the power and adjust phase
        sequence. Measure the compressor  operation current, and if any abnormal noise,
        Check whether the unit conform to the requirements, run for a period of time
       (general 3 days),after that, the unit can be used normally.

3.Normal operation

Heating process: start - up - water pumps runs -water flow switch inspection --- Fan

       operation compressor operation (when the low water level cut off, water supply
       induction valve opens

Operation Control:

Water level control:When the low level switch disconnect, open the water supply

        induction valve to supply enough water, meanwhile stop the water supply pump.
       Open the water supply pump when high level switch closed, After high-level switch
       closed for two minutes , open water supply induction valve ( at least 2 minutes).

When water pump is on and the high level switch cut off ,if water temperature  <(set

       Temperature -5 degrees) , shut down water supply for tanks, If water tank temperature
        > (temperature -2 degrees) then open the water supply induction valve , after high-
       level switch closed for two minutes stop the water supply induction valve.When
       water pumps stopped, whatever conditions , should supply enough water. (Water
       supply switch on at 2 minutes).

For the first power-on boot, the circulating water pump, compressor, fan motor runs

       after low level switch closed.

During the unit operation, circulating pump open.When the unit stopped, the

       circulating pump will be delayed 30 seconds then stop functioning.

When water pumps open, meanwhile open water return induction valve, 10 minutes

       later, test the return water temperature, when the return water temperature > (water
       temperature -5 degrees), the return water induction valve stops. If the return water
       temperature <(tank water temperature -10 degrees), open the water return valve so
       that the water supply pump constantly store the hot water.When water supply pump
       closed, shut down the water return valve at the same time.

For normal start-up, the 4-way valve cut off, only when defrosting ,the unit will work

       in normal.

O N

Water temperature

(Set water
temperature
 

)

difference

OFF

Set water
temperature

.Installation instructions

Water heater

19

Содержание SWBM-10.5H-B/P-S

Страница 1: ...Installation Instruction Manual LOW AMBIENT HEAT PUMP WATER HEATER MODEL SWBM 10 5H B P S SWBM 17 5H B P S SWBM 35 0H B S...

Страница 2: ......

Страница 3: ...customers Product Introducing 2 Work principle 3 Performance Data 4 Dimension 5 Operation introductions 8 Wire Circuit Diagram 14 Installation instructions 16 Maintenance 20 1 CONTENTS Water heater C...

Страница 4: ...omponents without switching off the electrical supply to the unit Electric leakage switch protection device MUST be installed 3 It is forbidden to start any work on the electrical components if water...

Страница 5: ...Heat pump not only use less electricity to get heat from ambient air but are also able to combine using with solar equipment will not cause pollution and no poison gas exhausting All Round The Year Ho...

Страница 6: ...mpressor compress it the refrigerant gas became high temperature and high pressure Then the gas come into the water condensation into liquid emit a lot of condensation heat condensing heat absorbed by...

Страница 7: ...et Weight Gross Weight Unit Dimension L W H Weight kg Kpa Water pump Power Head M KW RPM dB A inch 3 m h mm mm W V PH Hz COP W W Running Current Heating A Heating Input Power W Scroll SWBM 17 5H B P S...

Страница 8: ...Water heater Dimension Measure mm The dimension for air source heat pump water heater SWBM 10 5H B P S 5 804 1510 1362 565 460 420 500...

Страница 9: ...Measure mm The dimension for air source heat pump water heater SWBM 17 5H B P S low ambient Dimension Water heater 6 1300 765 420 1370 460 500...

Страница 10: ...The dimension for low ambient air source heat pump water heater SWBM 35 0H B S Dimension Water heater Measure mm 7 1850 1580 508 1790 880 460 500...

Страница 11: ...ss to turn on or turn off the heat pump 2 1 2 After entering parameter or clock setting press once to return to main interface Start up state Stand by state 1 2 Initialization Operation introductions...

Страница 12: ...d keyboard is locked 3 2 2 Under locked state press both and at the same time for 5 seconds after Dee sound keyboard is unlocked heat pu Clock setting 3 3 Clock Setting 3 3 1 On main interface press o...

Страница 13: ...n minute 3 4 4 After setting the minutes press once to confirm and save all the Timer On setting and switch to Timer Off setting interface At this moment the hour of clock shows and flashes press or t...

Страница 14: ...31 32 Display also even system is not start up Actual testing value Actual testing value Actual testing value Actual testing value Actual testing value Actual testing value Actual testing value Actual...

Страница 15: ...or failure Ambient 12 System parameter setting 3 5 2 On the interface of Parameter and Status inquiry if not pressing any button within 10 seconds system automatically exit the inquiry interface and r...

Страница 16: ...em 1 compressor high pressure failure System 1 compressor low pressure failure System 1 compressor air exhausting temperature too high power phase failure Auxiliary heater temperature too high protect...

Страница 17: ...lve Fan Motor Swichable maghtism valve Wire Controller Transformer U CONTACTOR 1 V W YLW GRN Ambient Temp Economizer inlet Temp Economizer outlet Temp Compressor side air discharge Temp Air fin evapor...

Страница 18: ...er A B C N1 N2 N3 3 High Press Switch SYS1 High Press Switch SYS2 SYS1 Low Press Switch SYS2 Low Press Switch Electric heater protect Water flow Wire Controller C Z 1 C Z 2 C Z 3 C Z 4 C Z 5 C Z 6 C Z...

Страница 19: ...o the distance between the barriers shown in below picture pay attention to arrow direction Water tank 1Water tanks should be placed where ambient temperature is above 0 1Can be installed outdoors or...

Страница 20: ...own on the manual and in accordance with national corresponding construction standards 1Installation of water pipes should be straight and flat pipeline collocation should be rational ensure to minimi...

Страница 21: ...ck the electricity distribution System 1Check if the power supply same as shown on manual and rating label 1Check if all the power supply and control wiring are all well connected check if the wiring...

Страница 22: ...2 minutes 1 When water pump is on and the high level switch cut off if water temperature set Temperature 5 degrees shut down water supply for tanks If water tank temperature temperature 2 degrees the...

Страница 23: ...around should remain clean well ventilated Regularly clean 1 2 month the side air heat exchanger to maintain a good effect of heat exchange 7 Frequently check whether each part of the unit work normal...