Installation instructions
1. Unit installation
1).Installation location
Host unit
1
Should be installed in a larger & well-ventilated place.
1
Installation location should ensure unhindered access outlet (inlet & outlet shown as
below).
1
Install gutter or set up positions near the outfall, to facilitate the drainage.
1
The installation base or bracket should be a steady, to ensure the smooth operation of
generating units.
1
Make sure the unit is vertical after installation, and no incline.
1
Make sure not to install the host unit in the any conditioner of pollution, corrosive gases,
sun and fallen leaves, etc.
1
Installation location must not next to place of incendive , easy-explosion and fire .
1
Installation must pay attention to the distance between the barriers shown in below
picture (pay attention to arrow direction).
Water tank
1
Water tanks should be placed where ambient temperature is above 0
℃
.
1
Can be installed outdoors or the top of the building (based on the size of water tanks and
the load-bearing capacity of the building and so on).
1
Do not have water tanks installed in the pollution, corrosive gases place.
2).Unit installation
1
Units base can be installed as cement concrete structures, steel brackets can also be used,
add the shockproof rubber pads , make the base surface flat.
1
Units can be designed based on the working performance.
(See Table of technical performance parameters)
1
Unit should have drain or drainage inlets.
1
Normally required to install in the place where setted cement concrete base.
Ⅷ
.Installation instructions
Water heater
16
1000mm above the top
Above 1000mm
Above 1000mm
Above 1000mm
Air inlet
Air inlet
Air inlet