Table of contents
1.1 Information about the User Manual.................................................................... 4
1.2 Transportation..................................................................................................... 8
1.3 Packaging........................................................................................................... 8
1.4 Storing................................................................................................................ 9
1.5 Equipment marking – Rating plate...................................................................... 9
1.6 Warranty........................................................................................................... 10
1.7 Repairs / returns to Ecolab Engineering GmbH................................................ 10
1.8 Contacts............................................................................................................ 11
2.1 General safety advice....................................................................................... 12
2.2 Intended use, foreseeable misuse.................................................................... 12
2.3 Indications of risks............................................................................................ 13
2.4 Arbitrary conversion and spare parts production.............................................. 15
2.5 Safety precautions by the operator................................................................... 15
2.6 Microbiological examination of decentralized disinfectant metering units........ 16
2.7 Personnel requirements.................................................................................... 17
2.8 Personal protective equipment (PPE)............................................................... 18
2.9 Installation, maintenance and repair work........................................................ 19
...........................................................................................
.....................................................................................
7.1 Hot water operation (optional, only with upstream mixer tap)........................... 31
7.2 Bleeding of product and water pipe.................................................................. 32
7.3 Setting the concentration.................................................................................. 33
7.4 Calibration......................................................................................................... 34
7.5 Checking the Concentration............................................................................. 35
8.1 Device commissioning / product changeover................................................... 36
8.2 Hot water operation (optional, only with upstream mixer tap)........................... 37
Operational malfunctions / Troubleshooting
.......................................................
10.1 Specifications for microbiological testing of decentralised disinfectant
11.1 Component exchange..................................................................................... 46
11.2 Pump replacement.......................................................................................... 52
11.3 Electrical connections..................................................................................... 54
12 Consumables and spare parts
..............................................................................
12.1 DG1-III - Housing with main electrical components........................................ 56
12.2 Spare parts sets for dosing pumps and conversion sets................................ 57
12.3 Spare parts set DLA with holder (without dosing pump)................................. 58
Table of contents
2
MAN049250 Rev. 1-01.2021
Содержание DG1-III-DLA-PCB
Страница 2: ......
Страница 72: ......
Страница 141: ...W Wall mounting Installation 26 Warranty Guarantee 10 Water connection Connections 27 Index 69 MAN049250 Rev 1 01 2021...
Страница 142: ......