13
EN
420010334402
Max P 35 / 45 AB
H
(m)
ø 10 mm ø 12 mm
0
0,5
1
2
3
3,5
32
36
40
48
56
60
90
90
90
90
90
90
AS 67
(m)
H
H
H
(m)
ø 10 mm ø 12 mm
0
0,5
1
2
3
3,5
25
21
18
10
5
---
70
62
54
38
20
10
AS 67
(m)
Two-pipe siphon feed system
Two-pipe lift system
Length pipe (m)
MAXIMUM LENGTHS OF SUCTION LINES FOR TWO-PIPE SYSTEM SUNTEC AS 67
2
1
–
MOUNTING TO THE BOILER
ELECTRICAL CONNECTIONS
All burners are factory tested at
230V 50 Hz
single phase
(Max P 35) o 400 V 50 Hz
3-phase
(Max P 45) for
motors and 230V 50 Hz
single phase with neutral for auxiliary equipments
.
Should it be necessary to power
the burner with 230V - 50Hz, modify the connections on motor and the terminal board as shown in the pic-
ture. Protect the burner supply line with suitable fuses and/or other safety devices as required by the local
regulations on the matter.
Length pipe (m)
Содержание MAX P 35 AB
Страница 9: ...9 IT 420010334402 Max P 35 45 AB 7 7 8 9 10 SMONTAGGIO TESTA 1 2 3 4 5 6...
Страница 18: ...18 EN 420010334402 Max P 35 45 AB 7 7 8 9 10 REMOVING FIRING HEAD 1 2 3 4 5 6...
Страница 27: ...27 FR 420010334402 Max P 35 45 AB 7 7 8 9 10 DEMONTAGE TETE DE COMBUSTION 1 2 3 4 5 6...
Страница 36: ...36 ES 420010334402 Max P 35 45 AB 7 7 8 9 10 DESMONTAJE CABEZA DE COMBUSTION 1 2 3 4 5 6...
Страница 43: ...43 RU 420010334402 Max P 35 45 AB LED tw tw AL LED 10 2 TSA 3 4 5 6 7 8 5 9 10 off 3...
Страница 45: ...45 RU 420010334402 Max P 35 45 AB 7 7 8 9 10 1 2 3 4 5 6...
Страница 46: ...46 RU 420010334402 Max P 35 45 AB 3 2 0 I 4 1 0 2 2 2 2...
Страница 54: ...54 DE 420010334402 Max P 35 45 AB 7 7 8 9 10 Ausbau des Mischkopfes 1 2 3 4 5 6...
Страница 56: ...56 IT EN FR ES RU 420010334402 Max P 35 45 AB DE...
Страница 57: ...57 IT EN FR ES RU 420010334402 Max P 35 45 AB DE...
Страница 62: ...420010334402 Max P 35 45 AB RU ES FR EN IT 62 DE...
Страница 63: ...420010334402 Max P 35 45 AB RU ES FR EN IT 63 DE...