6
Typical Installation Illustrations
FIG. 5
FIG. 5
120 Volt
Outlet
Soft
Water
Hard
Water
Hard
Water to
outside
faucets
CROSSOVER
Use if water supply flows from the left.
Include single or 3-valve bypass.
MAIN WATER P
IPE
Hard
Water
Soft
Water
To
Softener
Inlet
From
Softener
Outlet
1” NPT Sweat
Adaptor (2)
not included
1” NPT
Installation
Adaptor (2) *
O-ring Seal (2) *
Bypass Valve
*
Clip (4) *
* Included with softener. Pipe and
fittings supplied by installer.
Valve
INLET
Valve
INLET
1” NPT
Installation
Adaptor (2) *
O-ring Seal (2) *
Clip (2) *
1” NPT Sweat
Adaptor (2)
not included
INLET
Valve
OUTLET
Valve
BYPASS
Valve
MAIN WATER P
IPE
INSTALLATION USING 3-VALVE BYPASS
For soft water
SERVICE
:
- Open the inlet and out-
let valves
- Close the bypass valve
For hard water
BYPASS
:
- Close the inlet and out-
let valves
- Open the bypass valve
Soft
Water
Hard
Water