G
RASS
T
RIMMER
/B
RUSH
C
UTTER
O
PERATOR
'
S
M
ANUAL
17
11. Secure throttle linkage and leads to drive shaft with cable clips
supplied.
12. Install power head and align gear box, power head and U-handles.
Tighten all screws.
13. Place throttle linkage in slot in bracket with one nut (A) and
washer on each side of bracket. Finger tighten both nuts (A).
14. Attach inner throttle cable to swivel (B). Check throttle for freedom
of movement and that wide open throttle / low idle extremes are
adjusted properly. If adjustment cannot be achieved by adjusting
nuts (A), consult with your Echo Dealer for correct adjustment
procedure.
15. Attach ignition leads (C).
16. Install air filter and cover.
17. Balance unit.
a. Put on harness and attach unit to harness.
b. Slide clamp (K) up or down drive shaft housing until unit
balances with cutting attachment approximately 2 - 3 in. from
ground.
c. Tighten harness clamp screw.
2 - 3 "
K
Содержание SMR-2100
Страница 2: ......