Manual XrGi 20G-To
3.2.1.1. Foundations
3.2.1.2. room temperature/dust
3.2.1.3. exhaust gases
3.2.1. location
The Power Unit must be set up on a level, watertight, non-inflammable base of sufficient strength. The base foundations must
be designed to take the weight of the XRGI 20G-TO (750 kg).
The room temperature should be kept below 35 °C, and should never exceed 40 °C to maximise the service lives of some of
the components (electronics). If temperatures are expected to be higher, the room must be ventilated to control the tempera-
ture. The XRGI 20G-TO may not be set up in dusty areas or in areas with high humidity levels, e.g. laundry rooms. The area
should be completely dust-free, so the Power Unit inlet filter does not clog up. The room must be ventilated as laid down in
section 5.5 "Additional requirements when installing gas equipment Art B“ in DVGW worksheet G600 (TRGI).
The exhaust gas system must be designed in accordance with DVGW worksheet G600 (TRGI) section 6 "Gas-fired unit ex-
hausts". Consult your district master chimney sweep before you install the system. The exhaust gas temperature is around
110 °C when the system is new. However, older XRGI systems, which have been in continuous operation, can be expected
to show temperatures of anything up to 140 °C. Mass/volume flow at full load is approx. 130 kg per hour, i.e. approximately
100 m³ per hour. The pressure drop in the exhaust system must not exceed 20 mbar.
The exhaust system must be designed to be pressure-tight. The power unit is not designed condensing operation. However,
a condensate drain should be fitted to catch any condensate that arises.
Boiler room
Separate location
Space approved under model boiler regulations and/or Federal State regulations
Consider the following chapters when deciding where to install the system:
"General setup location findings", section 5.2, "General setup findings", section 5.3 and "Additional requirements when instal-
ling gas equipment Art. B“, section 5.5, DVGW worksheet G600 (TRGI) must be followed.
The setup location must meet the following criteria:
There must be sufficient clearance for installation and future maintenance work.
The entrance must be at least 800 mm wide, with no stairwells, etc. impeding free access to the location.
It is also highly beneficial if adjacent areas enable pallet trucks or forklifts to be used.
Space must be adequate for the installation of fireplaces, heat pumps, CHP stations and fixed combustion engines.
The area must be well lit.
A 230 V AC power supply is required for the Q60-Heat Distributor.
The area must be ventilated.
The area must be frost-free.
The XRGI 20G-TO must not be set up in the vicinity of boiler air inlets.
3.2. General insTallaTion insTruCTions
Consult a structural engineer for statical calculations on how to best distribute the load permissibly
over the floor.
Содержание XRGI 20G-TO
Страница 1: ...System components Installation INSTRUCTIONS...
Страница 2: ...2 Version 1 0 2012 Manual XRGI 20G TO...
Страница 98: ...98 Version 1 0 2012 Manual XRGI 20G TO...
Страница 131: ...131 Version 1 0 2012 Manual XRGI 20G TO...
Страница 152: ...152 Version 1 0 2012 Manual XRGI 20G TO...
Страница 153: ...153 Version 1 0 2012 Manual XRGI 20G TO...
Страница 154: ...154 Version 1 0 2012 Manual XRGI 20G TO...
Страница 155: ...155 Version 1 0 2012 Manual XRGI 20G TO...
Страница 156: ...156 Version 1 0 2012 Manual XRGI 20G TO...
Страница 157: ...157 Version 1 0 2012 Manual XRGI 20G TO...
Страница 158: ...158 Version 1 0 2012 Manual XRGI 20G TO...
Страница 159: ...159 Version 1 0 2012 Manual XRGI 20G TO...
Страница 160: ...160 Version 1 0 2012 Manual XRGI 20G TO...
Страница 161: ...161 Version 1 0 2012 Manual XRGI 20G TO...
Страница 162: ...162 Version 1 0 2012 Manual XRGI 20G TO...
Страница 166: ...166 Version 1 0 2012 Manual XRGI 20G TO Notes...
Страница 167: ...167 Version 1 0 2012 Manual XRGI 20G TO...
Страница 168: ......