3.4

 

LUBRICATION

 

Lubrication of the Inner Rotor bearing and Bracket 
Bearing (both are sleeve bearings) is dependent on the 
pumpages' lubricating qualities/material selection of the 
bearing. 
The Ball Bearing is lubricated at the time of assembly 
with a high quality lithium base grease. Replacement of 
this grease is normally only necessary when major 
maintenance is carried out. 
 

3.5 STARTUP CHECKLIST

 

• 

Lubricate as required. 

• 

Alignment of couplings. 

• 

Direction of rotation. 

• 

Freedom of rotation of shaft. 

• 

Inlet and discharge valves open 

• 

Product available for pumping 

• 

Special precautions as required 

 
Do not start pump against closed discharge valve or with 
inlet (suction) valve throttled. Ensure bypass valve (if 
fitted) is operational and set to the correct pressure.  

Do not exceed system or pump design pressure as 
equipment failure could result.Do not run pump dry. 
Failure to remove air/vapour could prevent pump 
from priming and result in pump damage.

 

3.6

 

OPERATIONAL CHECKS

 

Inspect pump frequently during the first few hours of 
operation for such conditions as excessive heating of 
bearings or stuffing box, vibration, unusual noises etc.  
 

3.7

 

BYPASS VALVE

 

To protect the pump from overpressure due to 
inadvertent shutting of discharge system, EBSRAY can 
supply integral or inline Bypass Valves which are capable 
of circulating the entire pump output. The integral type 
Bypass Valve is mounted on the pump Cover and 
bypasses pumpage from the pressure side to the inlet 
side of the pump. 
The inline type Bypass Valve is installed in the pump 
discharge line and normally returns to the inlet side of the 
pump or back to tank. Fluid temperature will rise if 
differential pressure is high and recirculating bypass 
conditions are maintained for extended periods 
(particularly with integral Bypass Valve). The Bypass 
Valve should be set on site, in accordance with the 
predetermined pump and/or system differential pressure 
required. Refer separate instructions.  

 

 

SECTION 4 - MAINTENANCE

 

CAUTION 

PRIOR TO ANY DISASSEMBLY OR SERVICE, 
VERIFY THAT ALL REQUIREMENTS OF STATUTORY 
REGULATIONS OR CODES ARE MET AND THAT 
SPECIFIC SITE REQUIREMENTS ETC ARE 
SATISFIED.

 

Some minor maintenance tasks and inspections can be 
performed with the pump 'in line' so long as complete 
isolation, depressurising and purging procedures have 
been completed. However for major maintenance it is 
recommended that the pump be removed from the 
installation.  
 

4.1

 

SPARE PARTS

 

1. 

When ordering spare parts, to ensure a minimum 
of delay and correct replacement to original 
specification ALWAYS quote the pump Serial 
Number which is located on the nameplate of the 
pump.  

2. 

 

Advise the name, item number and quantity 
required.  

 

(Refer to Drg No. CMP051) 

3.  

Advise complete delivery instructions. 

 
 
 
 
 
 
 
 
 

 

4.2

 

PREPARATION FOR DISASSEMBLY

 

1. 

Obtain the appropriate Work Permit if required. 

2. 

Isolate pump from liquids in inlet and discharge 
lines, depressurise and purge out any toxic, 
flammable, corrosive or air hardening liquids. 

3. 

Isolate power supply to motor. 

4. 

Disconnect porting connections. 

5. 

Remove pump from installation.  

6. 

Mark relevant mating components for correct 
reassembly orientation. 

4.3

 

DISASSEMBLY

 

Note: Before proceeding, make sure Bracket is firmly 
attached to baseplate or bench etc. to avoid 
overbalancing when rotor is withdrawn. Mark relevant 
mating components to ensure correct replacement. 

1. 

Remove pump coupling half. 

2. 

If fitted, remove Bypass Valve assembly from 
Cover – Refer Section 5 

3. 

Remove Lockscrews on both Inner and Outer 
Lockrings. 

4. 

Release Grubscrews and unscrew Locknut from 
Shaft. 

5. 

Remove Outer Lock Ring. 

6. 

Remove lubrication/cooling circulation harness 
assemblies if fitted 

.

 

4

Содержание HD600

Страница 1: ... INSTALLATION OPERATION MAINTENANCE INSTRUCTIONS FOR EBSRAY MODEL HD600 ROTARY INTERNAL GEAR PUMP EBSRAY PUMPS PTY LIMITED ACN 000 O61 003 628 PITTWATER RD BROOKVALE NSW 2100 AUSTRALIA PH 61 2 9905 0234 FAX 61 2 9938 3825 ...

Страница 2: ...n and the carrier s copy of the consignment note and a claim should be made immediately on the transport company Should a shortage be evident on receipt notify EBSRAY immediately giving full details and packing note number 1 5 HANDLING Do not drop pump pumpset Care should be taken in moving handling pumps pumpsets A sling should be placed under or around a pump pumpset in order to minimise stress ...

Страница 3: ...hich are not involved in the meshing cycle are sealed by the crescent C Body and Cover Refer Fig 5 3 2 PUMPING PRINCIPLE When rotation is started there is an increase in cell volume as the teeth come out of mesh This creates a partial vacuum and the pressure differential thus created initiates movement of the liquid through the inlet port D filling the teeth cells of the two displacement rotors Wh...

Страница 4: ... maintained for extended periods particularly with integral Bypass Valve The Bypass Valve should be set on site in accordance with the predetermined pump and or system differential pressure required Refer separate instructions SECTION 4 MAINTENANCE CAUTION PRIOR TO ANY DISASSEMBLY OR SERVICE VERIFY THAT ALL REQUIREMENTS OF STATUTORY REGULATIONS OR CODES ARE MET AND THAT SPECIFIC SITE REQUIREMENTS ...

Страница 5: ...d Rotor Bearing if replacement is required 4 4 INSPECTION Inspect components for damage or excessive wear Note that typical wear of components in EBSRAY s rotary Internal Gear positive displacement pumps tend to compensate each other and working clearances are to some extent maintained by this compensation If pump performance has been satisfactory existing components although worn may still have a...

Страница 6: ...iametral clearance X for the two points Repeat this procedure for the other two measurement points X2 c To check clearance between Inner Rotor and Cover crescent Inner Rotor should be held towards inlet plane Refer Fig 7 7 Ensure all lubrication cooling circulation harness assemblies are clear of any obstructions 8 EBSRAY recommend replacement of all Gaskets Seals and O rings at every overhaul to ...

Страница 7: ...adjusted correctly are designed to have a very small amount of seepage If packing is too tight it will generate excessive heat if too loose it will leak excessively 12 Lubricate Lipseal on Inner Lockring and slide Lockring along Shaft screw Lockring in until it protrudes approximately 4mm from thread on pump side 13 Lubricate Bracket Ball Bearing Fit Bearing to Shaft and drive Bearing into positio...

Страница 8: ...ody and re machine or replace 2 Check Valve for damage or deposits Clean thoroughly or replace Valve as required If worn or if seat or Valve is damaged lap cleaned replaced Valve into valve seat 3 Inspect Bypass Valve Spring Replace if broken or damaged 4 It is advised that all gaskets be replaced whenever disassembled 5 Check Cap Washer Adjusting Screw and Locknut for damage Replace as required 5...

Страница 9: ...r discharge pipes of insufficient diameter causing excessive friction loss 5 Bypass valve pressure setting too low Increase pressure by screwing in adjusting screw DO NOT exceed pump or system design pressure or overload motor etc 6 Insufficient NPSH available 7 Excess axial clearance setting of rotor to cover 8 Excess clearances in pump due to wear 6 3 EXCESSIVE POWER CONSUMPTION 1 Differential p...

Страница 10: ...alve Spring 1 54 Bypass Valve Lock Nut 1 55 Bypass Valve Adjusting Screw 1 56 Bypass Valve Adjusting Screw Cap 1 56A Gasket Adjusting Screw Cap 1 57 Bypass Valve Gasket 2 60 Inner Rotor 1 61 Inner Rotor Bearing 1 62 Inner Rotor Pin 1 63 Inner Rotor Pin Nut 1 64 Inner Rotor Pin Washer 1 64A Inner Rotor Pin Spacer 1 68 Bracket 1 69 Rotor Bearing 1 69A Extraction Washer 1 69B Extraction Washer O ring...

Страница 11: ...11 11 ...

Отзывы: