background image

Chapter 3

 

Back Panel I/O 

 

 

 

Note: For details of I/O ports on the back panel, please refer to 

Chapter 

7 – I/O Definition

 

 

3.2. Battery Pack Installation 

 

Before power-on the device, please install the battery (optional accessory) to the 

mainboard: 

1.  Un-tighten four screws on the back panel anticlockwise. 

 

 

 

 

Содержание SPPC70-5B-C1G

Страница 1: ...User s Manual SPPC70 5B C1G SPPC70 5B C15G SPOS70 5B C1G SPOS70 5B C15G...

Страница 2: ......

Страница 3: ...uipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is...

Страница 4: ...rective 2002 96 EC concerning waste electrical and electronic equipment WEEE The Directive determines the framework for the return and recycling of used appliances as applicable throughout the Europea...

Страница 5: ...ard and USB ODD 7 LAN Cable 8 Cash Drawer 8 PS2 COM 8 MSR Installation 9 3 4 Wall mount Kit installation 11 3 4 Turn on the Device 11 Driver and Utility Installation 12 4 1 Before the installation 12...

Страница 6: ...gs 27 Virtual Button Option 27 Right Button Function 28 Right Button Automatic Mode 29 6 5 Feedback Sound 29 Feedback Sound Option 29 Tone 30 Duration 30 6 6 Screen Calibration 30 4 points mode 1 31 4...

Страница 7: ...age more than one hour without any external power supply 4 x USB 2 0 1 x RS 485 422 232 3 x RS 232 Gigabit Ethernet port RJ 45 cash drawer port RJ 11 and 1 X parallel port equipped Video Module Option...

Страница 8: ...Chapter 3 2 2 Unpacking the Box Verify that the box contains the following items 1 Device X 1 2 Power Adaptor X 1 3 Power Cord X 1 4 Driver and utility CD X 1 5 Wall mount Kit x 1...

Страница 9: ...p 3 1 Quick Tour Front View LED Indicator The Power indicator will glow green when power is on The HDD indicator will blink green when the HDD is accessed The LAN indicator will blink green when trans...

Страница 10: ...I O ports on the back panel please refer to Chapter 7 I O Definition 3 2 Battery Pack Installation Before power on the device please install the battery optional accessory to the mainboard 1 Un tight...

Страница 11: ...Chapter 3 5 2 Open the back panel 3 Separate the back panel from the front panel by lifting up and lay it down carefully 4 Un tighten the two screws fixing the battery bracket...

Страница 12: ...Chapter 3 6 5 Insert the battery into the battery bracket as shown below 6 Tighten the two screws to fix the battery bracket 7 Plug the power cable to the 9 pin power connector in the correct orient...

Страница 13: ...panel 3 3 Peripherals Installation Power Adapter Connect the 4 pin output jack of the adapter to the DC 19V jack on the back panel of the device USB Mouse USB Keyboard and USB ODD Connect your USB Mo...

Страница 14: ...another end to your internet device Cash Drawer Connect one end of RJ 11 cable to the Cash Drawer port on the back panel of the device another end to your cash drawer PS2 COM 1 Connect the female con...

Страница 15: ...3 9 MSR Installation 1 Remove the three plastic covers from the device as shown below 2 Open the device as steps describe in the section 3 2 3 Pass the MSR cable through the hole of the chassis as sho...

Страница 16: ...hapter 3 10 4 Plug the MSR to the connector in the correct orient 5 Tighten two screws of the MSR assembly as shown below 6 Close the back panel and tighten the four screws on the back panel 7 Finishe...

Страница 17: ...kit 2 Align the screw holes of the wall mount kit to the holes of the device and tighten the four screws 3 4 Turn on the Device 1 Make sure all peripherals are connected properly 2 Press and hold the...

Страница 18: ...ures described below are based on Microsoft Windows XP 1 Connect an external USB CDROM drive to the USB port and insert the driver CD and turn on the device The program autoruns and displays the DRIVE...

Страница 19: ...Chapter 4 13 2 Click Next 3 1 Click Next 3 2 Read the License Agreement carefully and click Yes 4 Click Next...

Страница 20: ...Chapter 4 14 5 1 Select restart your computer right now or later 5 2 Click Finish 4 3 VGA Driver Installation 1 Click Graphic Driver 2 Click VGA Driver for WIN2K XP...

Страница 21: ...Next 3 1 After files extracted click Next on the welcome screen 4 Read the License Agreement carefully and click Yes and then the installation starts 5 1 Select restart your computer right now or lat...

Страница 22: ...Chapter 4 16 4 4 LAN Driver Installation 1 Click RTL81x0 LAN Driver 1 1 On the welcome screen click Next 1 2 Click Install to begin the installation 3 Click Finish...

Страница 23: ...Chapter 4 17 4 5 Audio Driver Installation 1 Click AC 97 Audio Driver 2 Configures new software installation 3 Click Configure Anyway...

Страница 24: ...Chapter 4 18 4 AC 97 drivers begins to install 5 1 Select restart your computer right now or later 5 2 Click Finish 4 6 Wireless LAN Driver Installation 1 Click AC 97 Audio Driver...

Страница 25: ...Chapter 4 19 2 On the welcome screen click Next and then the installation begins 3 1 Select restart your computer right now or later 3 2 Click Finish...

Страница 26: ...device you can adjust any power management option that your unique hardware configuration supports 5 1 Enter Power Option Properties Sheet There are two alternatives to enter Power Options Properties...

Страница 27: ...ings under Power Schemes tab Under Power schemes area click the drop down list to choose a power scheme to apply settings that fit the way you use SPPC 70 Under Settings for Home Office Desk Power sch...

Страница 28: ...gets low and what action will be taken for SPPC 70 under Alarms tab Low battery alarm and Critical battery alarm Check the box to enable Low battery alarm and Critical battery alarm function Specify...

Страница 29: ...23 Click Alarm Action to enter alarm actions setting sheet On alarm actions setting sheet select the type of alarm notification which action SPPC 70 will take and which program will launch when the al...

Страница 30: ...er Meter You can check power status under Power Meter tab Check or uncheck the box to switch icon view and bar chart view Under the icon mode click the battery icon to show the detailed information ab...

Страница 31: ...dvanced You can specify power saving settings by checking boxes in Options area and clicking drop lists in Power button under Advanced tab Hibernate Enable the hibernate function by checking Enable hi...

Страница 32: ...l button setting dialogue box c Feedback Sound Open the feedback sound setting dialogue box d Power Save Open the power down timer adjustment dialogue box e Calibration Switch to calibration screen f...

Страница 33: ...ck Virtual Button button the dialogue box shows The selected option will be in black Virtual Button Option Under Virtual Button Option group box there are four options Stream Mode Under this mode all...

Страница 34: ...on the event selector will be enabled and show on the left bottom corner of the screen Automatic Mode Manual Mode Drop down List If the Drag Drop Mode under Virtual Button Option group box is select t...

Страница 35: ...n the pop up menu shows The minimize value is 0 5 and maximum value is 5 This option defines how long the right button function will be off The minimize value is 0 5 and maximum value is 5 Click the d...

Страница 36: ...releasing from the screen Tone Drag the bar to adjust the frequency of the sound effect The minimize value is 200 and maximum value is 5000 Duration Drag the bar to adjust how long the Beep sound wil...

Страница 37: ...reen to touch the center of Cross Mark e Repeat Step 2 Step4 to finish the calibration procedure 4 points mode 2 a The mark shows in the middle of the length of the screen b Follow the instruction in...

Страница 38: ...bration click Yes to restore the old calibration click No How to Use Event Selector 1 On the desktop of Windows click icon 2 icon change to 3 Now the tapping is simulating right mouse button clicking...

Страница 39: ...cal information about all I O ports as followings 7 1 Power Connector PIN Description PIN Description 1 19V 3 GROUND 2 19V 4 GROUND 7 2 Serial Port COM Port 1 2 3 4 PIN Description PIN Description 1 D...

Страница 40: ...scription PIN Description 1 GND 6 PC_CLK KEYBOARD 11 CTS 2 5V 7 KB_DAT 12 RTS 3 RXD 8 KB_CLK 13 DSR 4 TXD 9 RI 5V 12V 14 DCD 5 PC_DAT KEYBOARD 10 DTR 15 KB_EN 7 4 Cash Drawer Connector PIN Description...

Страница 41: ...Chapter 7 35 Cash Drawer Control Status Address Value Open 280H Bit 4 0 Close 280H Bit 4 1 Read Status 281H Bit 0 0 1...

Страница 42: ...Chapter 8 36 8 Specification...

Страница 43: ...Pin Header or DB9 COM6 Internal for Touch Panel Parallel 1 x DB25 ECP EPP SPP USB 4 x USB 2 0 LAN 1 x RJ45 Gigabit Ethernet PS2 COM 1 x internal for MSR iButton Cash Drawer 1 x RJ11 12V Audio AC 97 2...

Страница 44: ...Chapter 8 38...

Отзывы: