Rigging Multi-Column Arrays (Anya/Anna) 

The Anya/Anna Flybar has a built in “pin and tapered slot” feature, allowing users to create multi-

column arrays with the proper spacing and angle between columns. Before rigging multi-column 

arrays, verify your configuration in Resolution. 

 

1.

 

Begin with two stacks of up to 4 Anna/Anya modules, both with Flybars already rigged on top.  

2.

 

Attach chain motors to the Flybar of the first column as defined by your Resolution model, 

then raise the first array slightly, and then remove the caster pallet. 

3.

 

Move the second column into place and adjust the height of the flown array as needed to align 

the columns. Once the columns are at the same height, align the two columns such that the 

tabs of one Flybar engage with the slots of the other Flybar.  

4.

 

Slide the columns relative to each other until the two quick release Flybar pins can be engaged 

through BOTH Flybars. 

5.

 

Tighten the two cam levers on the sides of the Flybar by spinning the handles until the 

mechanism begins to grab and then flipping the cam lever closed, similar to the operation of a 

bicycle wheel’s quick-release hub. 

6.

 

Proceed as indicated in “Rigging Modules to Flybar” and “Rigging Modules from Modules” 

except with multiple columns simultaneously. Take great care when working within the multi-

column array. Tight spacing and many similar and identical rigging grips create the potential for 

human error and potential injury. 

 

Содержание ADAPTive systems

Страница 1: ...Accessory Rigging Guide...

Страница 2: ...rd Flybar 11 Suspension of Anna OPTION 2 Flybar Lite 12 Suspension of Otto Flybar 13 Rigging Modules to Flybar Single column Anya 14 Rigging Modules to Flybar Single column Anna 14 Rigging Modules to...

Страница 3: ...2 Anya Caster Pallet 25 Anna Caster Pallet 26 Otto Caster Pallet 27 Service Inspection Maintenance 28 General Service 28 Contacting EAW 28 Operating Questions 28 Service Information 28...

Страница 4: ...ach fully loaded Distro Rack is capable of supplying up to 12 ADAPTive modules with full power and with complete data redundancy If the user elects not to employ data redundancy each Distro Rack could...

Страница 5: ...onous output To ensure correct cabling ADAPTive Systems include a cable package based around 6 module fan out looms of customized lengths as well as extenders This system supports a variety of array l...

Страница 6: ...r provided solution meet these specifications Cable Ethernet CAT5e UTP or better 300 feet 91 meters maximum etherCON Connector RJ45 with or without Neutrik NE8MC cable carrier Multi Pin Connector Link...

Страница 7: ...tories power distribution unit s or PDU s One PDU is capable of powering six 6 modules as well as two data switches Up to two PDUs may be mounted in a Distro Rack but each PDU must be powered directly...

Страница 8: ...perate on voltages ranging from 90 to 265V AC 50 60 Hz No module setting changes are necessary to switch between regional voltage ranges 120 208 220 etc As with data ADAPTive systems include pre defin...

Страница 9: ...oduct Electrical Warnings AC MAINS SUPPLY WARNING Read all instruction and cautionary notes concerning electrical power in the EAW Loudspeaker Owner s Manual AC Mains Cable The AC mains cables supplie...

Страница 10: ...integral to the enclosures There is no option to splay each module and the modules are only designed to be flown in a straight vertical orientation Use the correct holes on the Flybar as determined b...

Страница 11: ...i e slings spansets shackles etc and facility s rigging structure is certified and capable of meeting the required load of the system For arrays larger than a single column use Resolution to determine...

Страница 12: ...s connecting members i e slings spansets shackles etc and facility s rigging structure is certified and capable of meeting the required load of the system For arrays larger than a single column use Re...

Страница 13: ...s rigging structure is certified and capable of meeting the required load of the system For arrays larger than a single column use Resolution to determine the appropriate hang style and support method...

Страница 14: ...he chain motors connecting members i e slings spansets shackles etc and facility s rigging structure is certified and capable of meeting the required load of the system For arrays larger than a single...

Страница 15: ...ou do not see the orange reflective tape Any visible orange indicates that the pins are not fully engaged Pull the Pin Grip all the way out then firmly push the Pin Grip in until you feel a positive s...

Страница 16: ...s already on top of stacks 1 The Flybar has built in Rigging Latches that will slide into the 4 Rigging Channels of the top Otto module On the top Otto module pull back on the 4 Pin Grips to open the...

Страница 17: ...on the simple and safe Rigging Latch and pin design Two grips on each side of the Power Plant control the rigging elements The upper Pin Grip drives the Rigging Pins in and out while the lower Latch...

Страница 18: ...he captive Rigging Latches which should drop into the Rigging Channel from their own weight If the Latches do not drop by themselves there may be a misalignment between the modules If needed press lig...

Страница 19: ...where the indicated action must be performed on all four corners of an Otto module and or array To attach a module to another within a column 1 Using a chain motor hoist the first 1 3 modules includin...

Страница 20: ...themselves there may be a misalignment between the modules If needed press lightly until the Latch Grips are all the way down If the Latches still do not drop retract and lock the Latch Grips the rai...

Страница 21: ...y When an array is properly and safely flown the ONLY orange that should be visible will be on the Latches of on the bottom most module ANY OTHER VISIBLE ORANGE ON THE ARRAY INDICATES A PROBLEM AND MU...

Страница 22: ...s needed to align the columns Once the columns are at the same height align the two columns such that the tabs of one Flybar engage with the slots of the other Flybar 4 Slide the columns relative to e...

Страница 23: ...uick release hub 5 Attach chain motors to the Flybars as defined by your Resolution model 6 Fly out the first stack of Otto modules 7 Proceed as indicated in Rigging Modules to Flybar and Rigging Modu...

Страница 24: ...Distro Rack 3 Re pin the quick release pins to lock the Flybar to the Distro Rack Attaching Multiple Distro Racks 1 Once detached from Caster Pallet lift Distro Rack by either physical or mechanical...

Страница 25: ...ommended that you do not attempt this installation while the system is suspended in air 1 Inventory of your kit Your kit will include 1 Black 25mm Screw Lock Carabiner 2 Locate Carabiner Mounting Poin...

Страница 26: ...et so that the stack pads line up with the bottom module 2 Release the 4 quick release pins from the Caster Pallets Rigging Channels 3 Pull and turn the Latch Grips to release the Rigging Latches from...

Страница 27: ...Anna module line up with the recesses in the pallet 2 Release the 2 quick release pins from the Caster Pallets Rigging Brackets 3 Pull and turn over to left the two 2 Latch Grips to release the Riggi...

Страница 28: ...he Otto module line up with the recesses in the pallet 2 Release the 4 quick release pins from the Caster Pallets Rigging Brackets 3 Push over to left the four 4 Latch Grips to release the Rigging Lat...

Страница 29: ...ing EAW We have attempted to make this manual and the Resolution Help File as thorough as possible However feel free to contact us with any further questions or comments for topics not covered Operati...

Страница 30: ...hts reserved Products are not drawn to scale All terms conditions and specifications subject to change without notice RD3026 A Eastern Acoustic Works One Main Street Whitinsville MA 01588 USA tel 800...

Отзывы: