XAP Series Busduct

Storage, Installation, and Maintenance

Joint Cover Installation

After the connectors are tightened, the joint covers may be installed in 

turn and tightened with bolts. In the case of four wire housing, please 

connect ground bolts and ground copper braiding to ground holes.

Figure 6. Joint Cover Installation

Expansion Joint Installation

This is a transition section to compensate for expansion and contrac-

tion due to long time operation of busduct. For detailed   mounting 

position, refer to the installation drawing. The expansion joint has been 

tightened and assembled in factory. Check the connecting bolts of 

expansion joints. Make sure that the expansion position has not been 

damaged due to vibration during transportation.

When connect the expansion joint to the straight busduct, please be 

noted to align the N phase line, to avoid incorrect phase sequence after 

connection. Expansion joints have the same installation sequence as 

for the straight busduct. For detailed installation clearance, refer to the 

installation clearance table and the installation drawing

Notes:

 after completion of one line installation, it is necessary to 

loosen all M6*25 bolts in the expansion joints to ensure expansion 

effect (see Figure 7).

Figure 7. Expansion Joint Installation

End Cover Installation

End Cover is the end of a busduct system. It is composed of insulating 

pieces and manufactured for field requirements. End Cover is placed 

onto the end of busduct with correct phase sequence.

Figure 8. End Cover Installation

Settlement Joint Installation

Settlement joint is to compensate height difference caused by vertical 

offset at the joint of two workshops. For detailed mounting position, 

refer to the installation drawing. The settlement joint has been 

tightened and assembled in factory. Check the connecting   bolts of 

settlement joints. Make sure that the settlement position has not been 

damaged due to vibration during   transportation.

When connect the expansion joint to the straight busduct, please be 

noted to align the N phase line, to avoid incorrect phase sequence after 

connection. Settlement joints have the same installation sequence as 

for the straight busduct. For detailed installation clearance, refer to the 

routing plan supplied upon delivery.

Notes: 

after completion of one line installation, it is necessary to 

loosen the M8*30 bolts in the settlement joints to ensure settlement 

effect.

Figure 9. Settlement Joint Installation

Joint cover

Содержание XAP Series

Страница 1: ...xpansion Joint Installation End Cover Installation Settlement Joint Installation Horizontal Mounting Vertical Mounting Wall Penetrations Busduct Joint Clearances Tap off Unit Installation Attentions f...

Страница 2: ...tored in a covered clean dry space which is climate controlled to prevent condensation Do not allow the busduct to come in contact with corrosive fumes liquids salts or forms of concrete Storing the b...

Страница 3: ...ion When connecting pieces of the Eaton XAP busduct together make certain that contact surfaces are clean and free from contaminants Some section may have electrical lubricant on the contact surfaces...

Страница 4: ...the installation drawing Notes after completion of one line installation it is necessary to loosen all M6 25 bolts in the expansion joints to ensure expansion effect see Figure 7 Figure 7 Expansion J...

Страница 5: ...dened at the joints 3 Care should be given when locating drop rods in order to avoid placing hangers at joint and tap off unit locations Adequate ceiling clearance must be allowed for tap off units Ve...

Страница 6: ...able to avoid movement 2 Tap off unit shall not be burdened with load directly Loads at the rear end shall be fastened onto the busduct or other fixed positions in accordance with regulations 3 When n...

Страница 7: ...st be kept clean during installation 2 Busducts must be adjusted and kept in the same line before fastening the bolts of joint units Tolerance of assembly in horizon and vertical direction are 5mm per...

Страница 8: ...the mechanisms of all electrical and mechanical interlocks and padlocking means 8 Check for missing or broken parts rusting corrosion dirt and excessive wear 9 Check the line and load connections to e...

Страница 9: ...the environment through the use of power management technologies and services Eaton has approximately 95 000 employees and sells products to customers in more than 175 countries For more information...

Отзывы: