17
InstALLAtIon And opErAtIon MAnUAL
25-13400-C May 2019 www.eaton.com
9. Maintenance
9. Maintenance
It is a requirement of BS5839pt9 that a maintenance agreement be in place for the
EVCS, the maintenance schedule should be as follows:
Weeklye:
By the responsible person or their agent
, lift a different handset
on the system each week and make a call to the control, repeat
each week until all points are tested, record results in the site log.
6 Monthlye:
Engineer Call to check system operation and check battery health.
5 Yearlye:
Engineer Call to check system operation and replace the batteries.
Different maintenance schedules may be required in different countries, please check
your local standards.