Chapter 3
Installation
4
Copyright © 2008 Eaton Corporation. All Rights Reserved.
IPN 997-00012-56C September 2008
13
C
h
a
p
t
e
r
3
Installation
Overview
Topic Page
Task 3 - Mount the EPS2/EPS5 in the Rack
Task 4 - Connect the Output Cables
Task 5 - Install the Batteries Modules (if required)
Task 6 - Mount the Battery Temperature Sensor (if required)
Task 7 - Connect communications cable (if required)
Task 8 - Connect to the AC Supply Point