PREPARATION
Eaton 9910 UPS and EBM Installation Guide (6000 VA Models)
S
P-164000007 Rev 1
4
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase, and
file a claim for shipping damage. If you discover damage after
acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
Tools Required
To assemble the components, you may need the following tools:
S
#2 Phillips
®
screwdriver
S
Medium flat-bladed screwdriver
Содержание Powerware 9910 UPS
Страница 1: ...Powerware Series Eaton 9910 UPS and EBM Installation Guide for IBM Applications 6000 VA Models...
Страница 2: ......
Страница 3: ...Powerware Series Eaton 9910 UPS and EBM Installation Guide for IBM Applications 6000 VA Models...
Страница 48: ...SERVICE AND SUPPORT Eaton 9910 UPS and EBM Installation Guide 6000 VA Models S P 164000007 Rev 1 40...
Страница 49: ......
Страница 50: ...P 1640000071 P 164000007 1...