
INSTALLATION
EATON
Powerware
®
9125 (9910-P30) UPS Installation Guide for IBM
®
Applications
S
164201636 Rev A
6
The following steps explain how to install the UPS rail kit.
NOTE
All hardware (screws, clip nuts, etc.) referenced in Steps 2 through 4 are contained
in the rail hardware kit.
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 4).
Assembly Wing Nuts
Front
Rear
Rear Hold-Down Bracket
Figure 4. Adjusting the Rail Depth
2.
Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack.
3.
Secure both rails to the front of the rack with pan-head screws.
Insert the screws through the center holes of the rail (see Figure 5).
NOTE
Do not tighten the screws until the UPS or EBM is installed.
Figure 5. Securing the Front Rail
Содержание Powerware 9125
Страница 8: ...This page intentionally left blank ...
Страница 274: ...This page intentionally left blank ...
Страница 275: ......
Страница 276: ... 164201636A 164201636 A ...