INSTALLATION
EATON
Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications
S
164201698 Rev 1
21
8.
If optional EBMs are installed, see “Configuration Mode” on
page 30 to specify the number of EBMs installed.
NOTE
The batteries charge to 80% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 48 hours after installation or long-term storage.
If you have questions about implementing non- or dual-redundant power,
the following options are available:
S
View the circuit diagrams at www.powerware.com/ibm and select
Products > 9910 UPS for System i > E65 > Product Literature
S
Submit your question to “Ask the Expert” at
www.powerware.com/ibm/
S
Submit your question to our FAQ database at
www.powerware.com/Iibm and select General Knowledge >
Frequently Asked Questions
S
Contact the IBM office or Business Partner servicing your account
Table 8. Typical Power Connections (Figure 18–Figure 20)
Item
Description
1
NEMA L6-30R
2
NEMA L6-30P
3
IEC 320-C13
4
IEC 320-C19/C20
5
Burndy
®
UTG Connector
6
Country-specific UPS power (mains) cord
IBM FC
Plug Type
Supplier
Description
1420
12
IBM
NEMA L6-30P, 4.3m/14 ft
1421
12
IBM
NEMA L6-30P, 1.8m/6 ft
1422
40
IBM
RS 3750, 1.8m/6 ft
1423
40
IBM
RS 3750, 4.3m/14 ft
1424
46
IBM
IEC-309 (P+N+G) 32A, 4.3m/14 ft
1425
KP
IBM
KP, 4.3m/14 ft
1426
PDL
IBM
PDL, 4.3m/14 ft
1427
PDL
IBM
PDL-NZ, 4.3m/14 ft
Содержание Powerware 5125
Страница 1: ...Powerware 5125 9910 E65 UPS Installation Guide for IBM Applications ...
Страница 4: ...This page intentionally left blank ...
Страница 50: ...This page intentionally left blank ...
Страница 51: ......
Страница 52: ... 1642016981 164201698 1 ...