INSTALLATION
EATON
Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications
S
164201698 Rev 1
14
6.
Align the UPS front cover (provided in the E65 accessory kit) with
the right retaining hook and front cover holes on the UPS cabinet.
Insert the UPS front cover (see Figure 12).
Figure 12. Installing the Front Cover
7.
If you are installing an optional EBM, continue to the following
section, “EBM Installation;” otherwise, continue to “UPS
Installation” on page 16.
EBM Installation
C A U T I O N
A small amount of arcing may occur when connecting an EBM to the UPS. This is normal and
will not harm personnel. Insert the EBM cable into the UPS battery connector quickly and
firmly.
To install the optional EBM(s):
1.
Verify that all battery circuit breakers are in the OFF position (see
Figure 13).
2.
Plug the EBM cable into the UPS battery connector.
Содержание Powerware 5125
Страница 1: ...Powerware 5125 9910 E65 UPS Installation Guide for IBM Applications ...
Страница 4: ...This page intentionally left blank ...
Страница 50: ...This page intentionally left blank ...
Страница 51: ......
Страница 52: ... 1642016981 164201698 1 ...