INSTALLATION
EATON
Powerware
®
5125 (9910-E65) UPS Installation Guide for IBM
®
Applications
S
164201698 Rev 1
4
Tools Required
To assemble the components, the following tools may be needed:
S
Medium flat-bladed screwdriver
S
#2 Phillips screwdriver
S
8 mm wrench or socket
Rack-Mount Setup
The rail kit can be mounted in 48-cm (19-inch) panel racks from 61 to
76 cm (24 to 30 inches) deep.
NOTE
Mounting rails are required for each individual cabinet and are located in the UPS
and EBM cartons. All hardware is supplied.
NOTE
If placing the E65 in a rack with existing equipment, the rack must be reconfigured
to install the heaviest item in the bottom of the rack. The UPS weighs 73 kg (161 lb) and the
EBM weighs 77.1 kg (170 lb).
Each rail kit requires one (1) of each item in the following list:
S
Left adjustable rail assembly (located in the UPS and EBM cartons)
S
Right adjustable rail assembly (located in the UPS and EBM cartons)
S
Rail hardware kit (located in the E65 UPS and EBM accessory kits)
Содержание Powerware 5125
Страница 1: ...Powerware 5125 9910 E65 UPS Installation Guide for IBM Applications ...
Страница 4: ...This page intentionally left blank ...
Страница 50: ...This page intentionally left blank ...
Страница 51: ......
Страница 52: ... 1642016981 164201698 1 ...