background image

Eaton is a registered trademark. 

All other trademarks are property  

of their respective owners.

Instruction Booklet 

IB015001EN

Effective June 2015

Power Xpert Solar DC 

breaker recombiner 

  

Eaton

1000 Eaton Boulevard

Cleveland, OH 44122

United States

Eaton .com

© 2015 Eaton

All Rights Reserved

Printed in USA

Publication No . IB015001EN / Z16573

June 2015

Содержание Power Xpert

Страница 1: ...biner Contents Description Page Safety measures 2 Pre installation receiving handling and storage 3 Pre installation preparation 5 Considerations for seismic qualified installations 5 Electrical conne...

Страница 2: ...D WITHOUT THE SAFETY ALERT SYMBOL INDICATES A POTENTIALLY HAZARDOUS SITUATION THAT IF NOT AVOIDED CAN RESULT IN PROPERTY DAMAGE Eaton s liability for any errors or omissions in this document is limite...

Страница 3: ...t from dust dirt moisture and damage until ready for installation The Recombiner should remain attached to its shipping skid until it has been moved into its final installation position Handling WARNI...

Страница 4: ...which are top heavy equipment The forks or blades of the forklift must run through the entire Recombiner shipping length and be extended to the outermost sides of the wooden shipping skids see Figure...

Страница 5: ...ional requirements The entire area around the Recombiner should be thoroughly cleaned of all debris Considerations for seismic qualified installations Recombiners are seismic qualified and in seismica...

Страница 6: ...talled cables wire used to connect components between sections from damage when moving Recombiner sections into place An outdoor multi section Recombiner will ship with uninstalled intermediate roof c...

Страница 7: ...type washer see Figure 11 Holes are provided on the side of each Recombiner section for this purpose Three holes are located on the side of each section toward the front and back see Figure 12 Figure...

Страница 8: ...BUS OR COMPONENTS To accommodate future serviceability the manufacturer recommends that the head of the carriage bolt be mounted from the rear of the Recombiner for FRONT ACCESSIBLE Recombiners with t...

Страница 9: ...r of the crimp tool Once the lug is affixed to the conductor reinstall the lug on the lug pad using the existing hardware Torque hardware using information provided on Recombiner labeling Refer to App...

Страница 10: ...s on the Recombiner using hardware supplied by the manufacturer Take caution that conductors are not pinched between parts when installing the deadfront cover plates side sheets and filler plates All...

Страница 11: ...T AC DIELECTRIC MEGGER TESTING DAMAGE TO COMPONENTS WILL OCCUR A test resulting in readings at or above 1 mega ohm is satisfactory Compare these test readings with prior readings and retain with previ...

Страница 12: ...ts such as short circuits and overloads until the cause of the event has been identified and corrected After the event has been rectified test equipment per the maintenance process described in this p...

Страница 13: ...the part Drawing numbers Rating of part s Electrical equipment has a limited life span As such the manufacturer cannot guarantee the availability of obsolete equipment or parts Equipment replacement m...

Страница 14: ...VE POSITIVE Ground NEGATIVE Ground Date All overcurrent devices closed Phase to phase connections Phase to ground connections POSITIVE NEGATIVE POSITIVE Ground NEGATIVE Ground Notes Date All overcurre...

Страница 15: ...s Secondary control wiring Clean ventilation Date Checklist 3 Notes and actions taken Cleaning Bus and cable connections Insulation inspection Overcurrent device inspection Controllers Other protectiv...

Страница 16: ...eir respective owners Instruction Booklet IB015001EN Effective June 2015 Power Xpert Solar DC breaker recombiner Eaton 1000 Eaton Boulevard Cleveland OH 44122 United States Eaton com 2015 Eaton All Ri...

Отзывы: