manualshive.com logo in svg
background image

5

Instruction Booklet 

IB015001EN

Effective June 2015

Power Xpert Solar DC 

breaker recombiner 

  

EATON 

www.eaton.com

Pre-installation preparation

The permanent location of Recombiners must be on a smooth, 

solid, and level foundation . Alignment is verified in the factory prior 

to shipment .
An uneven foundation can cause misalignment of sections, units, 

doors, and other parts .
If a housekeeping pad is used, check factory drawings and verify 

handle height rules relative to the National Electrical Code (NEC

®

where applicable .
When embedded anchors or channel sills are used, materials 

and attachments must be adequate to support the structure(s) . 

Recombiner sections must be aligned and level over the length  

of the installation .
From manufacturer’s drawings, determine the layout of the 

Recombiner equipment for each location . Verify and confirm  

that the available equipment space and equipment location(s)  

are in compliance with the minimum working space clearances  

per the NEC .
Refer to the manufacturer’s Recombiner drawings for available 

conduit area in each section before installing the finished grade 

flooring (see 

Figure 6

) . Conduits must be installed in conduit  

area shown to ensure compliance with NEC wire bending  

space requirements .

otee:

N

Conduit areas may vary in each section of a multi-section  

Recombiner lineup .

Figure 6. Conduit space drawing—floor plan

otee:

N

Used for reference only . See drawings for actual space . 

The preferred method of anchoring the Recombiner is by fastening 

the Recombiner to steel channels that are properly and permanently 

embedded in a concrete floor or by using anchors designed for  

this purpose .
Conduits, floor, and/or wall openings or other penetrations, should be 

located relative to the space shown on the manufacturer’s drawings .
Refer to the National Electrical Code for installations in damp 

locations for additional requirements .
The entire area around the Recombiner should be thoroughly 

cleaned of all debris .

Considerations for  

seismic qualified installations

Recombiners are “seismic qualified” and in seismically active areas 

require additional considerations . Because electrical equipment is 

installed as part of a system, pre-engineering layouts are critical in 

seismic applications .
Eaton Recombiners are marked as “seismic qualified,” and anchoring 

the Recombiner is critical in seismically active areas . Experienced 

engineers in seismic requirements should select methods and 

techniques of attachment and tested anchoring systems . Embedded 

concrete anchors or steel attachments must be adequate to resist 

the forces established by the local building code . Bolts of the proper 

grade of steel must be correctly sized and torqued . The embedded 

anchors must be correctly installed in accordance with the method 

specified by the anchor manufacturer . Refer to seismic instructions 

in TD01508002E provided by Eaton for more information . 
Conduit layout in concrete for loads entering and/or exiting the 

bottom must be designed and installed to prevent damage from 

an earthquake . If top entry is necessary, seismic fittings or flexible 

conduit is needed .
Consult applicable local building codes and regulatory agencies for 

other specific requirements for seismic installations . Contact Eaton 

for additional information .

Installation

Use caution and appropriate equipment and practices when moving 

Recombiner into its final position .

 WARNING

RECOMBINER IS TOP-HEAVY. USE CARE IN HANDLING.

Determine the Recombiner orientation with the use of 

manufacturer’s drawings and markings on the Recombiner sections . 

Recombiners may be shipped either in individual sections or in  

two or more sections joined by the manufacturer (see 

Figure 7

  

and 

Figure 8

) .

Figure 7. Recombiner A—front view

otee:

N

Recombiner A has a shipping split between Sections 1 and 2 . This is 

depicted by “*” within the circle between sections . 

Dimensions in inches (mm)

3.00

(76.2)

2.50

(63.5)

3.00

(76.2)

2.50

(63.5)

1

 

*

 

2

 

Содержание Power Xpert

Страница 1: ...biner Contents Description Page Safety measures 2 Pre installation receiving handling and storage 3 Pre installation preparation 5 Considerations for seismic qualified installations 5 Electrical conne...

Страница 2: ...D WITHOUT THE SAFETY ALERT SYMBOL INDICATES A POTENTIALLY HAZARDOUS SITUATION THAT IF NOT AVOIDED CAN RESULT IN PROPERTY DAMAGE Eaton s liability for any errors or omissions in this document is limite...

Страница 3: ...t from dust dirt moisture and damage until ready for installation The Recombiner should remain attached to its shipping skid until it has been moved into its final installation position Handling WARNI...

Страница 4: ...which are top heavy equipment The forks or blades of the forklift must run through the entire Recombiner shipping length and be extended to the outermost sides of the wooden shipping skids see Figure...

Страница 5: ...ional requirements The entire area around the Recombiner should be thoroughly cleaned of all debris Considerations for seismic qualified installations Recombiners are seismic qualified and in seismica...

Страница 6: ...talled cables wire used to connect components between sections from damage when moving Recombiner sections into place An outdoor multi section Recombiner will ship with uninstalled intermediate roof c...

Страница 7: ...type washer see Figure 11 Holes are provided on the side of each Recombiner section for this purpose Three holes are located on the side of each section toward the front and back see Figure 12 Figure...

Страница 8: ...BUS OR COMPONENTS To accommodate future serviceability the manufacturer recommends that the head of the carriage bolt be mounted from the rear of the Recombiner for FRONT ACCESSIBLE Recombiners with t...

Страница 9: ...r of the crimp tool Once the lug is affixed to the conductor reinstall the lug on the lug pad using the existing hardware Torque hardware using information provided on Recombiner labeling Refer to App...

Страница 10: ...s on the Recombiner using hardware supplied by the manufacturer Take caution that conductors are not pinched between parts when installing the deadfront cover plates side sheets and filler plates All...

Страница 11: ...T AC DIELECTRIC MEGGER TESTING DAMAGE TO COMPONENTS WILL OCCUR A test resulting in readings at or above 1 mega ohm is satisfactory Compare these test readings with prior readings and retain with previ...

Страница 12: ...ts such as short circuits and overloads until the cause of the event has been identified and corrected After the event has been rectified test equipment per the maintenance process described in this p...

Страница 13: ...the part Drawing numbers Rating of part s Electrical equipment has a limited life span As such the manufacturer cannot guarantee the availability of obsolete equipment or parts Equipment replacement m...

Страница 14: ...VE POSITIVE Ground NEGATIVE Ground Date All overcurrent devices closed Phase to phase connections Phase to ground connections POSITIVE NEGATIVE POSITIVE Ground NEGATIVE Ground Notes Date All overcurre...

Страница 15: ...s Secondary control wiring Clean ventilation Date Checklist 3 Notes and actions taken Cleaning Bus and cable connections Insulation inspection Overcurrent device inspection Controllers Other protectiv...

Страница 16: ...eir respective owners Instruction Booklet IB015001EN Effective June 2015 Power Xpert Solar DC breaker recombiner Eaton 1000 Eaton Boulevard Cleveland OH 44122 United States Eaton com 2015 Eaton All Ri...

Отзывы: