UPS SYSTEM INSTALLATION
Eaton
Power Xpert 9395P UPS (300 kVA, 300 kW) Installation and Operation Manual
S
P-164000563 Rev 1
www.eaton.com/powerquality
4-7
4.6.2
External Power Wiring Installation
To install wiring to connections:
1.
Remove one top screw and two bottom screws securing each ISBM section left
and right front panel (see Figure 4‐2). Lift the panels straight up to remove them
from the panel hanger brackets at the top of the cabinet.
2.
Remove the screws securing the top and bottom internal safety shield panels
and remove the panels to gain access to the input, output, and battery terminals.
Retain the hardware for later use.
3.
Route the input and output cables through either the top or bottom of the cabinet
to the UPS terminals. See Figure 4‐5 through Figure 4‐8 for wiring access
information and terminal locations.
Top Access Wiring.
Remove the top conduit plate from the top of the ISBM
section. Identify all conduit requirements and mark their location. Drill and punch
all conduit holes in the top conduit plate prior to mounting on the ISBM section.
Install the conduit plate and install all conduit runs into the plate. Pull wiring
through conduit into the ISBM section wiring area.
Bottom Access Wiring.
Remove the bottom conduit plate from the inside bottom
of the ISBM section. Identify all conduit requirements and mark their location.
Drill and punch all conduit holes in the bottom conduit plate prior to mounting on
the ISBM section. Install the conduit plate and install all conduit runs into the
plate. Pull wiring through conduit into the ISBM section wiring area.
Front ISBM
UPM Ventilation Grill
Debris Shield
(Remove shield before
operating system.)
Front UPM
TOP VIEW
Figure 4‐4. ISBM and UPM Section Debris Shields